Laserfiche WebLink
3. The Everett School District has commented that the project will not adversely impact the School <br />District. No school mitigation fee is required. (SEPA Pubiic Services and Utiiities Policies) <br />4. In order to minimize erosion, any spoil piles must be covered with plastic sheeting or other <br />impervious covering staked to the ground or anchored with rocks or sandbags. Berms, aarlhen or <br />otherwise, should be conslructed at the perimeter of excavated areas to prevent adjacent sile runof( <br />from entering the excavalions. (SFPA Earlh and Water Policies) <br />5. if contamination of the surrounding soils is discovered, and remediation will take place, an erosion <br />control plan must be submitted for approval by the Public Works Department. (SEPA Earth and <br />Water Policies) <br />The lead agency for this proposai has determined that it does not have a probable significant adverse <br />impact on the environment. An Environmental Impact Stalement is not required under RCW <br />43.21C.030(2)(c). This determination assumes compliance with State law and City ordinances related to <br />general environmental protection including but not limited to right-of-way improvement requirements, <br />drainage, etc. This decision was made after review of a completed environmental checklist and o;her <br />information on file with the lead agency. This informalion is availab�e to the public on requesL This <br />Mitigated Determination of Non-Significance is specitically condilioned on compliance with the conditions <br />attached hereto whicl� are incorporated by reference as if fully set forth lierein. <br />This Final MDNS is issued under WAC 197-11-355. A 14-day public comment period for this proposal has <br />been completed. <br />Responsible <br />Official: Allan Gi((en, Direclor <br />Title: Pianning and Community Development Responsible Otficial <br />Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />Date: June 16, 2005 • <br />Signature: �_ � �' <br />You may appeal tliis determin tion by filing an appeal on forms provided by the Planning Department and a <br />fee to lhe PlanninglCornmunity Development Permit Services Counter at 3200 Cedar Street, 2nd Floor, no <br />later than 14 days from the date tl �e MDNS becomes final (which is after the 14-day comment period). <br />Contact Becky Fauver to read or ask about the procedures (or SEPA appeals. <br />NOTE: A DNS may be withdrawn in the event o( significant changes in the proposal, disclosure of <br />new significant in(ormation, misrepresentation by the applicant, or failure lo comply with the <br />condilions upon �vhich lhis Delennination of Non-Significance is predicated. <br />