Laserfiche WebLink
29. The Washington State Clean Air Act requires the use of all known, available, and reasonable means <br />o( controlling air pollution, including dust. Dust generated during construction activities can be <br />controlled by wetting those dust sources such as areas of exposed soils, washing truck wheels <br />be(ore they leave the sile, and installing and mainlaining gravel construction entrances. <br />Construction vehicle track-out is also a major dust source. Any evidence of track-out can lrigger <br />violalions and fines (rom the Department of Ecoiogy or llie Puget Sound Clean Air Agency. <br />GCNERAL INFORMATION <br />The Snohomish County PUD currently has suf(icienl capacity to serve the proposed development. <br />For further in(ormation about the electrical service requirements for this project, please r,all the <br />District's Everett O((ice al (425) 258-8272. <br />