My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 COLBY AVE COURTYARD BY MARRIOTT 2017-07-05
>
Address Records
>
COLBY AVE
>
3003
>
COURTYARD BY MARRIOTT
>
3003 COLBY AVE COURTYARD BY MARRIOTT 2017-07-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2017 1:32:33 PM
Creation date
2/27/2017 2:06:12 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3003
Tenant Name
COURTYARD BY MARRIOTT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
652
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Included in the proposal are water conservation efforts such as low flow fixtures. <br /> No additional mitigation is required. <br /> Issuance of construction permits will be predicated upon the project demonstrating that it <br /> complies with City standards for sewer and stormwater facilities. <br /> MRigaUon Measures <br /> No additional mitigation is required. <br /> Bette PUBLIC SERI]+CIES <br /> Eire and Emergency Ck ed ceD SenAces <br /> Poi ce and Pub,Hc Safety <br /> The proposal will not generate disproportional impacts on public services. Fire prevention and <br /> life safety design elements incorporated into the project supplement the basic building code <br /> standards. <br /> CAFdgarUon Measures <br /> No additional mitigation is required. <br /> Sectlen ENEROV/ MB) HAT MC X L R7,SCOURCES <br /> Eectr k�L�J <br /> The PUD indicates the system as sufficient capacity to serve the project. The project will <br /> include high efficient lighting, well-insulated exterior components including windows, and high <br /> SEER rated HVAC equipment. <br /> C itigaU o ri Fd-CaMNES <br /> No additional mitigation is required. <br /> Sectka Cao L?R OUALTITY <br /> The proposal incorporates several potential greenhouse gas mitigation measures identified in <br /> the Planned Action, including providing shared parking, improving pedestrian environment, <br /> constructing below grade parking, installing efficient fixtures and HVAC equipment, well <br /> insulated exteriors and low flow fixtures. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.