My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2222 ROSS AVE BASE FILE 2018-01-01 MF Import
>
Address Records
>
ROSS AVE
>
2222
>
BASE FILE
>
2222 ROSS AVE BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 1:26:36 PM
Creation date
2/27/2017 2:54:45 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSS AVE
Street Number
2222
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T CASCADE TESTING LABORATORY. INC. <br />IC= �i TESTINGhINSPECTION/ENGINEERS/GEOLOGISTS <br />I'�' - /' IIIYIY NE 1iB�.. PLACE <br />�y NNKL�.�O. W�Swn�GTOv YBO]< IIIOOIB33�Y000 <br />June 14, 1964 <br />Cert. No. 845-61G <br />Ker.nure Yre-Mix <br />P.U. tiox 2'L4 <br />Kenmore, W.4 98028 <br />Attention: Mike Kirkpatrick <br />Reference: Soils Study for New Batch Plant <br />Smitti Island <br />Everett, Washington <br />Dear Mike: <br />�cwrr�[ taoei eee�e�oo <br />[vERETT �aoe�aeo�oen <br />At your request we have conducted a soil� atudy at the site of <br />your proposed new batch plant at Smith Island in Everett. The fol- <br />lowing is a report of our findings, concl.usions and recommenda- <br />tions. <br />PURPUSE <br />The purpose of this study was to determine the soil and ground water <br />conditions at the site and to make recommendations to be used in tt�e <br />design and construction of the batch plant foundation. <br />The project as we understand it, is to consist of a po�table con- <br />crete batch plant. The structure will have column loads ranging <br />from 22k to 98k. No site plan was available at the time of this <br />study. <br />SCOPE <br />Two forty-nine (49) foot test borings were <br />stem auger rig on June 1, 1984. Standard <br />D-1586) samples were taken every five (5) <br />tions were selected with the assistance <br />Kenmore Pre-Mix. <br />drilled using a hollow <br />Penetration Test (ASTM <br />feet. The boring loca- <br />of Mike Kirkpatrick of <br />
The URL can be used to link to this page
Your browser does not support the video tag.