My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 EVERGREEN WAY EVERETT CHEVROLET 2017-03-01
>
Address Records
>
EVERGREEN WAY
>
7301
>
EVERETT CHEVROLET
>
7301 EVERGREEN WAY EVERETT CHEVROLET 2017-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 2:06:52 PM
Creation date
2/27/2017 4:05:15 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7301
Tenant Name
EVERETT CHEVROLET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I: PROJECT DESCRIPTION <br /> The proposed project Everett Chevrolet is located 7301 Evergreen Way Everett, WA- <br /> 98203. More generally, the site is located in Section 7, Township 28 North, and Range 5 <br /> East of the Willamette Meridian in the City of Everett, Washington. Please refer to the <br /> Vicinity Map attached later in the section. <br /> The site is currently developed with two commercial buildings. The remainder of the site <br /> exists as paved parking areas. There are no critical areas located within the site. Per SCC <br /> survey of Snohomish County, the project site contains Alderwood Urban Land Complex 2 <br /> to 8 percent soils that have a hydrologic classification of Type "C". Please refer to the soils <br /> map and descriptions attached later in this report for more details. <br /> The proposal is to construct a commercial building near the center of the site and large <br /> parking area intended for a car dealership. All existing structures will be removed. The <br /> access to the site will be from SR-99 (Evergreen Way). <br /> A 112'x 69.34'x 10.29' underground vault located underneath the parking area near the <br /> northeast portion of the site is proposed to meet the flow control requirements conforming <br /> to the City of Everett requirements. The detention vault was sized using Western <br /> Washington Hydrology Model V 3.0 (WWHM). The outflow from the detention vault will <br /> be discharged to Evergreen Way via a pump and closed pipe system. The overflow from <br /> the detention system will be located within the pump manhole and will be directed towards <br /> a dispersion trench. The dispersion trench will be located outside the buffer area and will <br /> disperse the flows through the buffer area to drain into an existing ditch near the southeast <br /> corner of the site. Runoff treatment would be obtained by the use of a 6'x12' Perk Filter <br /> Vault with 10 — 12"/12" cartridges manufactured by Oldcastle Stormwater Solutions <br /> located downstream of the detention vault and pump system per the City of Everett <br /> requirements. <br /> Insight Engineering Co. - Stormwater Site Plan 2/11/15 <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.