"EXHIBIT A" <br /> 4 <br /> Task 50201 —Site Reconnaissance and Data Collection <br /> URS staff Sri Rajah and Xiangdong Han will conduct a reconnaissance visit to the site,meet City <br /> representative Mr. Nasr and request and collect any more data that is required to complete the <br /> pre-design analysis. The additional data needs are: <br /> • As-built layouts of the pipe <br /> • Specifications of the sewer pipe including dimensions of pipe cross-section. <br /> • Proposed alignment of the railroad. <br /> Task 50202—Crossing Pre-Design <br /> URS will evaluate the feasibility of different crossing design approaches to safely resist the <br /> anticipated earth and live rail loading at the proposed crossing location. Conceptual level design <br /> of the crossings for options 1 and 2 will be developed based on the crossing, geotechnical, and <br /> pipeline data meeting the rail road design guidelines, AREMA Manual, and applicable federal <br /> and state design codes. This task will include: <br /> • Review geotechnical data available in the vicinity <br /> • Develop design parameters for evaluation of the sewer pipeline <br /> • Review as-built data and specifications of the 36-inch CCP sewer. <br /> • Establish the internal and external (earth and live) loading on the pipeline <br /> • Develop conceptual design of bridge crossing design(Option 1) <br /> • Develop conceptual design of case crossing design(Option 2) <br /> • Evaluate the feasibility of the different crossing options <br /> Task 50203—Cost Estimate <br /> URS will prepare a planning level cost estimate for crossing design options I and 2. <br /> Task 50204—Review Meeting <br /> URS staff, Sri Rajah and Xiangdong Han will attend one meting with City staff at about 70 <br /> percent completion of Task 50203. The purpose of the meeting will be to present the findings of <br /> Tasks 50202 and 50203 and to finalize the preferred option for design and costing_ <br /> Task 50205—Report <br /> URS will summarize the findings of pre-design evaluation consisting of feasibility evaluation and <br /> planning level cost estimates in a pre-design report. A draft pre-design report will be submitted <br /> to City and final report will incorporate review comments from City. <br /> Task 50206—Undefined Work <br /> As it is difficult to accurately anticipate all the issues that may arise during the pre-design work, <br /> this task establishes a contingency fiend for unidentified and unanticipated work. This task is <br /> specifically designed to allow payment to URS under this contract for changes in the scope of <br /> work which the City determines to be necessary. The funds in this task cannot be utilized without <br /> written approval from the city. <br /> URS / 9 Page 2 of 3 <br /> S:\SNasr36th St Sewer Protection\36th St Sewer Protection Scope July31 Revised SNN.doc <br />