My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4870
>
Resolutions
>
Resolution 4870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 11:07:53 AM
Creation date
3/2/2017 11:07:37 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4870
Date
2/9/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the parties. CSR-Associated shall coordinate with the City's Parks Depaitinent as to location of stubs <br /> for sewer and water service to each parcel. <br /> (k) Frontage Improvements. CSR-Associated shall provide curbs, gutters and <br /> sidewalk improvements to City standards for the Transfer Lots on the southerly side of Sievers-Ducey <br /> Blvd. from Glenwood Ave. to Hardeson Road that are consistent with the frontage improvements required <br /> for the re-development of the Property under Part Two of this Agreement. CSR-Associated shall not be <br /> required to install frontage improvements on the Transfer Lots until: (a) all necessary utilities have been <br /> extended to the Property, and(b)the frontage improvements can be installed simultaneously with <br /> frontage improvements required on the remainder of the Property; provided,however, in no event shall <br /> this occur later than October 31, 2001. CSR-Associated shall develop a timeline for construction of the <br /> frontage improvements, which plan shall be reviewed and approved by the City's Planning,Public <br /> Works, and Parks Departments. <br /> (1) Drainage and Detention Facilities. CSR-Associated shall provide interim <br /> stormwater detention and water quality treatment for the Transfer Lots pursuant to SEPA MDNS #99-037 <br /> until such time as a regional detention and treatment plan for the applicable drainage basin is prepared by <br /> CSR-Associated and approved by the City. Such detention and water quality treatment facilities shall be <br /> located on portions of the Property other than the Transfer Lots. The parties agree to a phased plan for <br /> stormwater detention and water quality treatment to accommodate development of the Property. <br /> 1.8 CSR-Associated Operations Pending Transfers. CSR-Associated may continue to <br /> perform its land filling operations on an area within the Property identified as Lots 45-B and 45-C after <br /> the transfer to the City of Lot 45-A. <br /> S:\GDoughty\W IN WORD\CSR\AgreementFinal.doc 15 <br /> Seattle/2.8.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.