My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2720 HOYT AVE LIBRARY PLACE 2018-11-28
>
Address Records
>
HOYT AVE
>
2720
>
LIBRARY PLACE
>
2720 HOYT AVE LIBRARY PLACE 2018-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2018 8:49:59 AM
Creation date
3/2/2017 2:35:59 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2720
Tenant Name
LIBRARY PLACE
Notes
PHASE I CONSTRUCTION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
538
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On Jun 18, 2007, at 8:06 AM, AES ((JDHIII)) wrote: <br /> Good morning Krista, <br /> I do have a few questions on this project so I can analyze what will be required, and discuss any special considerations with the Fire <br /> Marshal. <br /> 1) Due to communications is the site considered one building ? <br /> This project is considered 4 separate buildings: I for the garage levels (including housing units on these <br /> levels); I for the Tower; 1 for the Townhouses on California & I for the Townhouses on Rucker (see <br /> attached Unit Count Key Plan dated 5-15-07). <br /> 2) Please advise of the location any 2 Hr. Occupancy separations, or 4 Hr building separations though I don't see any locations that <br /> would fall into that category. <br /> We're working on this now. We will have 1-hour vertical occupancy separations & a 3-hour horizontal <br /> separation. We will send this info soon. <br /> 3) Do you have specific designations you are using for the 3 areas aside from the parking garage ? <br /> Not sure what you are looking for here-need more info. <br /> 4) Have there been any preliminary Design meetings with the City or Fire Dept regarding the project, if so does it have a designation <br /> number, and what if any information did they provide? <br /> We did have a Pre-App on 4-24-07. I do not have a designation number&formal meeting minutes were not <br /> provided. On May 11th, we sent building areas to the Fire Marshall for fire flow review (see text below & <br /> attached word document). We have not heard back. In a building code meeting with Tony Lee, City of <br /> Everett, he made a phone call to Rick Robinson, Fire Marshall. He said,preliminarily, that the fire flow <br /> would be 2875 gpm at worst& 1500 gpm at best and that the fire flow would be based on what's on top of the <br /> Construction Type IA podium (above Building #1). <br /> Hi Klaus, <br /> Attached is a document containing the gross building areas for the calculation of required fire flow for the <br /> proposed Skotdal project at Hoyt and California. <br /> After meeting with Tony Lee last week, it was decided to break the building up into one 'podium"structure of <br /> Type I construction with three separate structures on top. The Type I construction incorporates all areas on the <br /> lower P1 and P2 floors. Of the three buildings on top of the "podium"the larger residential structure will be <br /> Type III construction and the two smaller residential structures are proposed as Type LA construction. <br /> Let me know if you need any other info. <br /> Thanks. <br /> Jeff Oaklief Architect <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.