Project: <br /> Change Order No. <br /> Change Order Effective Date: <br /> CONTRACTOR <br /> By / , Date: jY1/9/o6. <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> The change of work is an extension of time to the contract. The additional time is <br /> needed to complete the contract work as a result of late equipment and material <br /> deliveries. There were also difficulties commissioning the new disinfection system. In <br /> addition to the items above a pump failure during startup requires additional time to <br /> implement corrective measures. <br /> 30 <br /> Page 3 of 3 <br />