Laserfiche WebLink
0) <br /> BID TABULATION <br /> '-` Hypochlorite Facility <br /> c...) W.O.# UP 3193 <br /> Date 1/4/2007 <br /> Prepared By: William Barrett <br /> For:John McClellan,Project Engineer ENGINEER'S ESTIMATI Pacific Crest Const. Boss Construction Apollo Inc. <br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> # ITEM DESCRIPTION UNIT QUANTITl PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br /> I Hypochlorite Building Base Bid LS 1 $3,434,600.00 $3,770,000.00 $3,770,000.00 $4,133,445.00 $4,133,445.00 $4,472,256.00 $4,472,256.00 <br /> 2 Install 61 Driven Steel Piles at LF 4800 $258,000.00 $56.25 $270,000.00 $23.40 $112,320.00 $57.46 $275,808.00 <br /> Baseline Depth of 80 Feet <br /> 3 Sheet,Shoring,&Bracing LS 1 $5,000.00 $5,000.00 $5,000.00 $110,000.00 $110,000.00 $17,376.00 $17,376.00 <br /> 4 Pothole for Underground Utilities EA 30 $7,050.00 $300.00 $9,000.00 $200.00 $6,000.00 $744.67 $22,340.10 <br /> Using a Vactor Truck <br /> 5 Force Account FA 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 <br /> 6.00 Tax LS 1 $327,199.90 $357,244.00 $383,711.79 $420,349.09 <br /> L <br /> Totals: $4,131,849.90 $4,511,244.00 $4,845,476.79 $5,308,129.19 <br />