My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/03/07 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/03/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 11:44:22 AM
Creation date
3/6/2017 11:43:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/7/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Q EVERETT COMPREHENSIVE PLAN • <br /> Adepte rgets 19,251 2,197 207260 428 3,069 882 46,391 <br /> Area 20,578 3,145 24460 527 3,371 1,132 52,913 <br /> Alternative ' Wig-Trends Adopted-Targets High-Grewth-iii-UGA <br /> 209 86,117 86,117 86,147 <br /> 40,983 46,391 52,913 <br /> Total-Employment <br /> Capacity 0 132,515 -1060 <br /> The Comprehensive Plan adopted by City Council in August 2005 included population and <br /> employment capacities for the Everett Planning Area by Subarea by Alternative. The Plan was <br /> subsequently appealed to the Central Puget Sound Growth Management Hearings Board. The <br /> Board ordered the City to quantify the holding capacity within the city limits and reconcile the <br /> entire planning area target population for 2025 with Snohomish County, or take other legislative <br /> action to increase density in order to accommodate the projected 2025 growth. <br /> The City completed the capacity analysis for Everett's city limits and determined that more than <br /> sufficient capacity exists to accommodate Everett's adopted targets for population and <br /> employment. The analysis was also completed for the urban growth area based on Everett's <br /> adopted land use map. Assumptions were based upon the assumptions included in the 2002 <br /> Buildable Lands Analysis modified by: <br /> • Higher residential densities in the Core Residential Areas described in the Housing Element <br /> where unlimited densities will be allowed. <br /> • Higher densities along the B-2 zoned Broadway corridor, where the area of unlimited <br /> densities is proposed for expansion as part of the Broadway Design Plan. <br /> • Densities/employees for projects obtaining permits from 2001-2005. <br /> • Densities/employees for pending projects. <br /> • Expanded B-3 zone boundary. <br /> (Detailed information is available for review in the City of Everett Planning and Community <br /> Development Department.) <br /> Snohomish County approved their 10-Year Comprehensive Plan Update in December 2005. <br /> Population and employment capacities for the adopted Plan were documented in the December <br /> 21, 2005 Snohomish County UGA Land Capacity Analysis Technical Report completed by <br /> Snohomish County Planning and Development Services Long Range Planning Division. <br /> Snohomish County's Plan included higher targets for population and employment within the <br /> unincorporated portion of Everett's planning area than did Everett's Plan. For the area within <br /> Everett's City limits, the Technical Report assumed that population and employment capacities <br /> were the same as Everett's adopted targets for the City limits. <br /> U <br /> LAND USE ELEMENT 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.