My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3030 COLBY AVE A&B 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3030
>
3030 COLBY AVE A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 3:49:10 PM
Creation date
3/6/2017 3:48:57 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3030
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> � <br /> � <br /> , _ . ._t.� �F_ . <br /> � . <br /> Auguet 18, 1971 , <br /> I <br /> , .,:; <br /> ��.. �F i <br /> G. H. Drumhe'Tl�r,- iVf, D, everett <br /> I 1515 Pacific Avenue <br /> p Everett, Washington 38201 ��,. NµL . :...s.., � <br /> � � � LVLIICTT. WAi111M6TON I <br /> Dear Dr. Drumheller: +°'°' <br /> , •, <br /> y gust 13th1Ptter p����T� ���Moro, <br /> , I have reviewed the comments made in our Au <br /> with the City IIuilding Inspection Department, the City Fire � <br /> Marshal and the Chief of Police. <br /> First, let me assure you that the application for a building permit <br /> to remodel the Parific and Colby 73uilding has not been d�nied by <br /> the City of �verett. 'Phe Uuilding permit application is currently <br /> being checked by the City Plan Checker and reviewed by other <br /> departmenta of the City to check compliance with the law and <br /> ordinances under their jurisdictior in accordance with Section i <br /> 302 (A) of the Uniform 13uilding Code. The City Plan Checker has <br /> informed me that the work contemplated is a nonstructural �lteration 1 <br /> not exceeding 25% of the value of the existing building anG �.i <br /> accordance with Section 104 of the Uniform Building Code the <br /> City cannot require the entire existing Uuilding to conform to the <br /> requirements for new Uuildings as a condition to issuance of a permit. <br /> The City Pire Marshal's office conducta a thorough inspection of each <br /> Uuilding at the time the major renovation is contemplated. The purpoae ! <br /> of this inspection is not only to insure that tlie woric described i <br /> in an application conforms to the requirements of the building code, <br /> but also to identify those existing hazardoua conditions which the <br /> owner should correct and may wish to incorporate into his renovation <br /> project, lt sliould Ue recognized that the Fire Marshal has tlie <br /> atrthority and responsi.Uiliiy under tlie Pire Prevention Code to <br /> correct hazardous conditions by issuance of a I�ire Marshal's Order <br /> at any time that a hazardous condition Uecomes apparent to him. <br /> By identifying po:ential l�azards prior to major renovation it ie <br /> possiUle to encourage Lhe elimination of hazardous conditions by <br /> incorporation into the proposed project and thus save the owner the + <br /> expense of a separate project that may be required ae a reault of <br /> a rire Marahal's Order. The City of �verett P'ire Marshal did <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.