My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3030 COLBY AVE A&B 2016-01-01 MF Import
>
Address Records
>
COLBY AVE
>
3030
>
3030 COLBY AVE A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 3:49:10 PM
Creation date
3/6/2017 3:48:57 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3030
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recoinmend to your arcliitect by a memorandum, a copy of �vhich <br /> is attached, tl�at the exieting facilities of the Pacific and (;o:by <br /> Building should be upgraded. The City Plan Citecker by a <br /> metnorandum, a copy of which is attached, auggeste� a proposed <br /> schedule for completion. Tl�ese two memorandums do not <br /> contemplate t3�at it is a requirement of the building code that exiat- <br /> ing facilities must be brought up to standard prior to the isauance <br /> of a building permit tor your proposed project. They do, however, <br /> indicate tl�at the City code enforcement officials are concerned about <br /> the safety of the existing exit tacilities in the Pacific and ColUy <br /> 13uilding, and that it would Ue advisable for tlie management of the <br /> Pacific and Colby IIuilding to work cloaely witli the P'ire,Marshal to <br /> ins�re that long term planning tor improvement of exit facilities <br /> is established. <br /> I d� share your coucern over tlic Pire Marshal's suggestion of putting <br /> a stairway from the third floor down to tlie ground on the north eide <br /> of tlie Pacifxc and ColUy I3uilding. Security coneiderationa must be <br /> taken into a:.count in devising a means to solve the life safety proUlem <br /> wliich concerns tlie Fire n7arshal. <br /> IIy this letter I am asking thc rire Marshal's office, in coordination <br /> with the Police Department, to review this �roblem with the management <br /> of the Pacific and Colby Building. Perhaps the only final ���ution to <br /> this problem would be to provide an enclosed second mea:x ..t egreas <br /> from the building. � <br /> I know that the community appreciates your eftorts to improve medical <br /> service to the citizens of Everett. I assure you that the code enforcement <br /> ofticers of the City of Everett will cooperate with you to insure that the <br /> proposed remodel of the second story of the Pacific and Colby Duilding <br /> proceeds in a satiefactory manner. Review of your application for a <br /> building permit should be completed in the near future. <br /> Youre ve trul;�, <br /> J� <br /> ROBERT C. ANDERSON <br /> Mayor <br /> cc: William Hw�ter, P'ire Chief w/c encls. <br /> Walter Cooper, h'ire Marshal „ <br /> h'rank Patterson, Chief of Police �� <br /> Lawrence Erickson, Chief Building Inepector ..1' <br />� Boteach & Naeh, Architecte <br /> �ncls. <br />� <br />� <br /> c <br />
The URL can be used to link to this page
Your browser does not support the video tag.