Marshbank Construction 1/25/2017 Change Order 1
>
Contracts
>
Capital Contract
>
Marshbank Construction 1/25/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 1:42:22 PM
Creation date
3/7/2017 1:42:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
1/25/2017
Department
Public Works
Department Project Manager
Grace Kane
Subject / Project Title
41st St to W. Marine View Dr. Corridor Impvts
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000049
Total Compensation
$125,608.53
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 5/9/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: 41st St to WMVD Freight Corridor Improvements <br /> Change Order No.1 <br /> Change Order Effective Date: December 19, 2016 <br /> Bid Item # 71 —Additional Traffic Loop Stubout Work. This new bid item is being added to pay <br /> for costs for additional electrical loop conduit work to house larger diameter wire that was not included <br /> in Contract. <br /> Bid Item # 72—Uniformed Police Officer. Intersection work requires that a uniformed police officer <br /> be present in the intersection to control traffic. There was not a bid item in the Contract to pay for this <br /> work, so this new bid item is being added to pay for costs to provide uniformed police officers for <br /> intersection control. <br /> Bid Item# 73—Class 4,000 Cement Concrete Sidewalk, 6-Inches Thick. This new bid item is <br /> being added to pay for costs to install higher strength concrete sidewalk in areas where heavy trucks <br /> frequently drive over sidewalk while turning. <br /> Bid Item # 74—Type E2 Cement Concrete Curb,3-Day Mix. This new bid item is being added to <br /> pay for costs to install E2 Curb in areas where curb and gutter is not needed, and was not included in <br /> the Contract. <br /> Bid Item # 75—Class 4,000 Cement Concrete Curb & Gutter, Type A-1. This new bid item is <br /> being added to pay for costs to install higher strength concrete curb & gutter in areas where heavy <br /> trucks frequently drive over curb while turning. <br /> Bid Item # 76—Black Polyvinyl Chain Link Fence. This new bid item is being added to pay for <br /> costs to install a fence behind the modular block wall that was installed as part of this Contract, and <br /> there was no corresponding bid item in the Contract to pay for the work. This fence is a safety <br /> requirement to ensure there is fall protection for entire length of wall. <br /> Contract Time: Twenty-five (25)working days are added to the Contract time as a result of <br /> Change Order# 1 as detailed below. <br /> 1. 5 working days added for additional loop and conduit work. <br /> 2. 5 working days added for acquiring and installing new cameras and additional electrical <br /> switches. <br /> 3. 5 working days added to acquire, manufacture made in USA fence material and to install <br /> fence. <br /> 4. 10 working days added to allow for time for private contractor to relocate gas station sign <br /> out of newly acquired City of Everett right of way and install in gas station property. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.