My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corrosion Engineering 1/25/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Northwest Corrosion Engineering 1/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 2:02:51 PM
Creation date
3/7/2017 2:02:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corrosion Engineering
Approval Date
1/25/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
Corrosion engineering services
Tracking Number
0000476
Total Compensation
$31,267.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A—SCOPE OF WORK orthwest Corrosion Engineering <br /> December 19, 2016 10995 Warfield Road, Sedro-Woolley, WA 98284 <br /> Phone: (360) 826-4570 Fax: (360) 826-6321 <br /> City of Everett, Dept. of Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attention: Jennifer Bailey <br /> RE: Exhibit A City of Everett—Professional Services Agreement, Corrosion Control <br /> The following Scope of Work items and associated budget are anticipated to be completed for <br /> the City of Everett in 2017 and 2018. As with previous years, a general task category has been <br /> included to provide on-call inspection services as various corrosion related issues arise. <br /> Cost Estimate Summary <br /> Task Description Estimated Reimbursed Estimated <br /> Hours Expenses Budget <br /> Provide field testing in support of a <br /> 1 cathodic protection system design 30 $150.00 $5,341 <br /> for Water Pipeline 5. <br /> Submit specifications and design <br /> 2 drawings for an impressed current 40 $6,921 <br /> cathodic protection system <br /> associated with Water Pipeline 5. <br /> Provide coating inspection and 40 $150.00 $5,012 <br /> evaluation services. <br /> 4 Provide on-call corrosion consulting 80 $300.00 $13,993 <br /> services on an as needed basis. <br /> Grand Total $31,267 <br /> The work of this proposal will be billed at current rates in accordance with our provided fee <br /> schedule in the attached EXHIBIT B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.