EXHIBIT A <br /> SCOPE OF WORK <br /> Exhibit A <br /> Everett Landfill <br /> Landfill Gas East Extension(Southern Portion) <br /> Scope of Work <br /> November 4,2016 <br /> Background <br /> The purpose of this scope of work is to prepare Contract Documents for the city's Job Order Contracting method <br /> (JOC)including drawings and specifications for an extension of the existing LFG header and collection system along <br /> a limited corridor on the east side of the Everett Landfill Tire Fire Site,south of the 41st Street extension bridge. <br /> Assumptions: <br /> • Design will be completed in accordance with the Everett Landfill Tire Fire Consent Decree and Cleanup <br /> Action Plan. <br /> • The header construction will be bid as an individual project and needs drawings and specifications. <br /> • Survey updates will be required to verify elevation and utility information. <br /> • The City will coordinate and meet as needed with Ecology. <br /> • No permits will be required. If permits are required,they will be completed/obtained by the City. <br /> • Temporary Construction Easements will be obtained by the City. <br /> • The City will provide observation services during construction and provide necessary documentation of <br /> construction activities for preparation of a CQA report. <br /> Tasks <br /> 1. Project Management and Coordination <br /> 1.1 Perform project set up,monitoring of project progress and budget,monthly invoicing and status reports. <br /> Assumed duration of this effort is 12 months(December 2016 through December 2017). <br /> 1.2 Participate in a coordination meeting at the City of Everett's offices.Consultant responsibilities include <br /> meeting preparation and follow up,and preparation of meeting minutes. <br /> Deliverables: <br /> ❑ Monthly invoices and status reports <br /> ❑ Meeting Minutes <br /> 2. Preliminary Design/Analysis <br /> Predesign: Consultant will conduct a hydraulic analysis of the LFG system to evaluate whether the additional <br /> collection and conveyance facilities will affect the system operation. The collection and conveyance facilities <br /> extension will be evaluated based on the previous landfill gas design and to minimize impacts from seasonal flooding <br /> of the area surrounding the LFG extension. The results of this analysis will be presented in pre-design figures for <br /> review by City. A review meeting including City Staff and the Consultant will be held to determine the preferred <br /> alternative. <br /> CQA Checklist Support: Consultant will provide technical support for the City prepared CQA checklist. The <br /> Consultant will provide design information and technical review to assist in the preparation of the checklist. <br /> 3. Update Basemap and Obtain Additional Information <br /> The purpose of this task is to supplement the existing base map with changes that have occurred since the last <br /> basemap was prepared(specifically the surcharge projects). The changes are primarily a result of preload contracts <br /> that have modified grades,utilities,and other features in areas that will be under construction.Task is limited to the <br /> following: <br /> ❑ One(1)ten(10)hour day of field survey along with subsequent drafting associated with basemap updates. <br /> ❑ One(1)six(6)hour day to observe pothole locates of the extent of the existing geomembrane cover in the <br /> project area. <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated November 21,2016) <br />