Assumptions: <br /> ❑ The City will provide crews and equipment to complete pothole locates. <br /> ❑ The potholes will be staked for future survey. <br /> 4. Final Design Drawings <br /> Plans will be prepared for the purposes of obtaining construction bids for the work and for obtaining regulatory <br /> approval required for construction. <br /> Preliminary Drawing List <br /> 1. LFG Collection and Conveyance Plan and Profile <br /> 2. LFG Collection and Conveyance Plan and Profile <br /> 3. Trench Details <br /> 4. LFG Details <br /> 5. LFG Details <br /> 6. Manhole Connection Details <br /> Deliverables: <br /> ❑ 80 percent level of completion Plans <br /> ❑ Revised Drawings for Construction(dependent on JOC Contractor review comments) <br /> 5. Specifications <br /> Specifications will be prepared for the purposes of construction. The specifications will include only technical <br /> specifications. The Specifications will be prepared in the following sequential submittals: <br /> Deliverables: <br /> ❑ 80 percent level of Specifications <br /> ❑ Revised Drawings for Construction(dependent on JOC Contractor review comments) <br /> 6. Design Coordination with JOC Contractor <br /> This task provides for services for coordinating the design and construction of the project with the City's JOC <br /> Contractor. The following services will be provided: <br /> ❑ Attend a design review meeting with the JOC Contractor to review the design details and specifications. <br /> Meeting will be held at Consultant's offices. <br /> ❑ Attend a review meeting with the City and the JOC Contractor to fmalize the JOC Contractor's scope and <br /> review comments on the construction documents(drawings and specifications). Meeting will be held at City of <br /> Everett and include a site walk-through. <br /> ❑ Limited addendum. <br /> 7. Services During Construction <br /> The Consultant will provide limited engineering services during construction to support the City and the JOC <br /> Contractor. Services will be limited to,as requested by the city;attending construction meetings and performing site <br /> visits,attending commissioning and startup,and assisting in preparation of punch list,record drawings,CQA and <br /> construction completion reports. It is our understanding that the City will continue to provide day-to-day onsite <br /> construction management and site inspections;therefore,Consultant has not included costs for full-time construction <br /> observation. <br /> Because the level of effort required for this task depends on factors outside of the Consultant's control such as <br /> contractor competence and cooperation,schedule,and weather related impacts,the scope of work for this task is <br /> limited to the level of effort included in the budget in Exhibit B. If this budget is not adequate for Construction <br /> Support,Consultant may request additional budget. <br /> Attending construction meetings and performing site visits: Consultant will perform up to six(6)site visits/meetings <br /> during construction as requested by the City. Site visits/meetings can be used to attend the onsite construction <br /> meetings,review construction progress,meet with the contractor,meet with City staff,and other activities. Meetings <br /> attended by Consultant can include the Consultant project manager and up to one other team member if so requested. <br /> Assisting in preparing the punch list: As requested,Consultant will attend the substantial completion site visit and <br /> provide recommendations to supplement the punch list that is prepared by the City. It is assumed that the completion <br /> of remaining items on the punch list will be verified City forces. <br /> Preparing the CQA report: Consultant will prepare a CQA report compiling CQA documentation and summarizing <br /> Page 13 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />