Laserfiche WebLink
the results of CQA activities for the work.The CQA Officer will prepare a statement declaring that,based on <br /> completion of the CQA activities described in this CQA plan and in his professional engineering judgment and <br /> opinion,that LPSB,LFG system components,leachate facility,and geomembrane repairs were constructed in <br /> general conformance with the plans and construction specifications and that the materials used in construction were <br /> in general conformance with the construction specifications. Documentation of construction activities such as daily <br /> reports,photographs,compaction monitoring results,record drawings,etc.will be provided by the others for <br /> incorporation into the report. A Draft CQA report will be prepared and submitted to the City for review. Comments <br /> received from the City will be incorporated into the Final CQA Report to be submitted to Ecology. If Ecology <br /> requires changes to the Final CQA Report,additional budget may be required. <br /> Deliverables: <br /> ❑ Punch lists to supplement City's Punch List—Initial,Interim,Final <br /> ❑ Draft and Final CQA Report <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />