My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC 1/31/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
BHC Consultants LLC 1/31/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 4:07:04 PM
Creation date
3/7/2017 4:06:48 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
1/31/2017
Council Approval Date
1/18/2017
End Date
6/30/2018
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Landfill gas system design services
Tracking Number
0000484
Total Compensation
$79,246.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the results of CQA activities for the work.The CQA Officer will prepare a statement declaring that,based on <br /> completion of the CQA activities described in this CQA plan and in his professional engineering judgment and <br /> opinion,that LPSB,LFG system components,leachate facility,and geomembrane repairs were constructed in <br /> general conformance with the plans and construction specifications and that the materials used in construction were <br /> in general conformance with the construction specifications. Documentation of construction activities such as daily <br /> reports,photographs,compaction monitoring results,record drawings,etc.will be provided by the others for <br /> incorporation into the report. A Draft CQA report will be prepared and submitted to the City for review. Comments <br /> received from the City will be incorporated into the Final CQA Report to be submitted to Ecology. If Ecology <br /> requires changes to the Final CQA Report,additional budget may be required. <br /> Deliverables: <br /> ❑ Punch lists to supplement City's Punch List—Initial,Interim,Final <br /> ❑ Draft and Final CQA Report <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br />
The URL can be used to link to this page
Your browser does not support the video tag.