My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10905 1ST AVE SE 2016-01-01 MF Import
>
Address Records
>
1ST AVE SE
>
10905
>
10905 1ST AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 5:40:54 PM
Creation date
3/7/2017 5:40:47 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST AVE SE
Street Number
10905
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, ' � I <br /> • r` _ � I <br /> \ � <br /> PUBL/C /�!/O/�Ks I <br /> �=`.� <br /> ���. <br /> AngUst 4, 1998 /,•� ._—_ ___._ ��I / �' ��� Q f <br /> � <br /> David Taylor � �/1 � ��-- <br /> 10905 - lst Avenue SE N//`f 9�1 �v�^-�'`' �r" W``�'�`� <br /> Everett, WA 98208 m _ ���� J��G,L <br /> y/� <br /> Subject: Owner: Taylor m� <br /> Job Addcess: 10905 - l�t Avenue SE <br /> Plan CYe:k IQo.: 59626 <br /> Deaz Mr. Taylor: <br /> In response to your application for a construction permit, your plans have been exan�ined and you aze <br /> advised that the issuance of a permit is being withheld for the reasons listed below. These comments <br /> address building issues only, additional revisions or additions may be required by other departmenu <br /> (such as 'Utilities, Planning or Fire). All references refer to the 1997 Uniform Building. Code, as <br /> amended by the State of Washington and/or Washington Statc Energy Cede 1997 Edition, unless . <br /> ;ta[ed otherwise. <br /> In ordec for Yhe processing of your application to contirnie; it will be necessary to provi�the <br /> Building Division witt► two complete new sets of drawings retlectiag the conectio�requested. <br /> T <br /> �) Provide size species and grade for beams and headers at all windows and doors. Siz4 bzam, <br /> v accord'u:g to loads specified in UBC 1997 edition. <br /> �� Specify size of posts. Locate on plans using d'uuensioati from outside walis. <br /> 3. Provide footings under posu. Specify wid[h, length and depth, and " required size and � <br /> quantity of reinforcing steel. <br /> � Specify size and grade of floor joists, and on center spacing. Show double joists as nc:eded for <br /> ( v framing around stau opening. <br /> 5. Provide foundadon plan. Show all required hold dawns. Specify hold downs shall be wired <br /> into place at time of foundation inspection. <br /> r 6./ All braced wall panels shall be clearly indicated on the plans. Construction of braced wall <br /> `/ panels shall be by one oF the methods specified in section 2326.11.2 UBC. <br /> 7��� Specify posWeam and posdfooting connecaons. <br /> �� Provide posts and/or multiple studs under both ends of all beams and headers. Show on plans. <br /> 9. Provide stair detail showing: <br /> .• <br /> ��. <br /> a) headroom ' <br /> b) rise, run <br /> c) framing . <br /> d) handrail �q'�� � <br /> CITY OF EVERETi• 3200 Cedar Sireet • Everett.WA 98201 • (425) 257-8800• F'ax(425)257-8A56 `�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.