My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2016-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 8:39:05 PM
Creation date
3/7/2017 8:38:16 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pau! McKee <br /> : Tom Weller[Tmw@deainc.com] <br /> Sent: Wednesday, July 13, 2005 9:49 AM <br /> To: wray@abam.com; JohnK@portofeverett.com <br /> Cc: edberg@abam.com; Paul McKee; Jim St. John; GrahamA@portofeverett.com <br /> Subject: ABAMOQ000014 (Satellite Rail/8arge Transfer Facility)-COEWater 8 Sewer <br /> John, Mike, <br /> Paul McKee from the Ci.ty of Everett contacted me late yesterday regarding Rail/Barge. His <br /> call was prompted by Graham Anderson's inquiry as to whether everything was in place to <br /> obtain building permits from the �ity. There are two issues that involve DEA; <br /> 1. The City of Everett desires that all City of Everett cor.struction notes be remov�d <br /> from the water plans and that the entire water system be buiit to Mukilteo Water District <br /> 3tandards. Paul d_d request that the 5-inch Storz fittings oii the fire hydrants ramain <br /> since the COEFD will be providing service to the site. <br /> 2. Paul must first verify this position with the rest of City Staff, but it is the desire <br /> by some ac the City to only inspect the connection of the 1 1/9-inch sanitary side sewer <br /> into the City's 12-inch force main. The remaining portion of the system would be part of. <br /> the City of Mukilteo's sewer system and would thus bu inspected and maintained by COM <br /> personnel. <br /> t9e will proceed with these efforts upon your direction and approval. We look forward to <br /> your re�ponse. <br /> Thomas Weller, P.E. <br /> Senior Transportation Engineer <br /> David Evans d Associa*es <br /> 1G20 West Marine Vicw Drive <br /> Everett, I9A 98201 <br /> Phone: (•i25) 259- 4099 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.