My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> 1 <br /> t 1 <br /> 2 DIVISION 2 <br /> 3 EARTHWORK <br /> 4 <br /> 5 <br /> 6 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> i <br /> � 7 Section 2-01.2 Disposal of Usable Material and Debris <br /> � 8 Is supplemented with the following: <br /> 9 <br /> 10 All debris from the selective clearing, grubbing, and pruning shall be physically <br /> 11 removed from the project in accordance with Disposal Method No. 2. <br /> i �2 <br /> ' 13 Section 2-01.3(1) Clearing <br /> � 14 Is supplemented with the following: <br /> 15 <br /> 16 The Contractor shall exercise care during clearing and grubbing activities to ensure <br /> 17 that the clearing and grubbing activities do not damage the root systems of the <br /> � 18 existing vegetation designated to be saved. The Contractor's operations shall be <br /> 19 conducted so vehicles and equipment do not operate, haul, park, or perform other <br /> 20 activity within the drip line of vegetation designated to be saved. <br /> 21 <br /> 22 The Contractor shall selectively clear, grub, and prune to create planting pockets <br /> 23 within existing vegetalion in lhe locations shown in the Plans or as directed by the <br /> ` 24 Engineer. This work includes selective removal of lhe following unwanted <br /> 25 vegetation: <br /> 26 <br /> ; 27 1. Overhanging shrub branches within an approved planting location <br /> ( 28 2. Blackberry <br /> 29 3. Scotch Broom <br /> 30 4. Noxious Weeds <br /> 31 5. Other undesirable vegelation as determined by the Engineer. <br /> 32 <br /> 33 The Contractor shall exercise care to not damage existing desirable vegetation. <br /> � 34 Work shall only commence when each day's activity has been reviewed and <br /> � 35 approved on site by the Engineer. <br /> 36 <br /> ! 37 Description <br /> ' 38 Section 2-01.3 of the Standard Specifications .� suppiemented with the following: <br /> 39 <br /> � 40 Existing riprap rock located on the beach within the area on Drawing B-1 noted <br /> ; 41 as "Approximate extent of existing riprap" shall be removed from the beach down <br /> 42 to one foot below the elevation oi the beach surface existing at the start of riprap <br /> i 43 removal. Riprap rock may be disposed in the back beach area of the constructed <br /> � 44 beach between Point B and Point E, and between Point K and Point L as shown <br /> 45 on Drawing B-1, under the condition that the top elevation of any disposed rock <br /> , 46 shall bP lower than 2 feet below the final grade of the specified back beach at the <br /> ; 47 location of rock disposal and shall be contained landward o( the specified <br /> 48 location o( the gravel berm crest. Riprap rock that is not disposed in the <br /> � 49 described back beach area shall be removed frorn the site and disposed in a <br /> I <br /> Port of Everett FAWAT•03-039 <br /> Satellite RaillBarge Transfer Facility Final Pnrt Review DraR <br /> 1 Phase 1:Pier Conslruction 37 15 Mareh 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.