My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � 1 DIVISION 4 <br /> 2 BASES <br /> � 3 SECTION 4.03 CEMENT TREATED BASE <br /> 4 <br /> N 5 Description <br /> 6 Section 4-03.1 <br /> 7 This item shall consist of a base course composed of mineral aggregate and <br /> � 8 cement uniformly blended and mixed with waler. The mixed material shall be <br /> 9 spread, shaped, and compacted in accordance with these specifications and in <br /> 10 conformity to the lines, grades, dimensions, and typical cross sections shown on <br /> � 11 the plans. <br /> 12 <br /> 13 Materials <br /> � 14 Section 4-03.2 <br /> 15 PORTLAND CEMENT. Portland cement shall conform to the requirements of <br /> 16 ASTM C150, Type I. <br /> i " <br /> 18 WATER. Water shall be clea�, clear, and free from injurious amounts of <br /> 19 sewage, oil, acid, strong alkalies, or vegetable matter, and it shali be free from <br /> � 20 clay or silt. IF the water is of questionable quality, it shall be tested in accordance <br /> 21 with the requirements of AASHO T 26. <br /> 22 <br /> 23 AGGREGATE. The aggregate shall be existing road bed materials. The <br /> � 24 material shall be free of roots, sod, and weeds. The crushed or uncrushed <br /> � 25 aggregate shall consist o( hard, durable particles of accepted quality, free from <br /> 26 an excess of ilat, elongated, soft, or disintegrated pieces, or objectionable <br /> i 27 matter. The method used in producing the aggregate shail be such that the <br /> � 28 finished product shall be as consistent as practicable. All stones and rocks of <br /> 29 inferior quality shall be wasted. <br /> f 3� <br /> � 31 CEMENT CONTENT. The cemenl treated base shall consist of an admixture of <br /> 32 Type 1 cement mixed with onsite soils to achieve a 5 percent by dry weight <br /> � 33 proportion. The cement content for construction shall be that at which the mix <br /> � 34 develops a 7-day compressive slrength of at least 750 psi. <br /> 35 <br /> 1 36 Construction Requirements <br /> 37 Section 4-03.3 <br /> 38 WEATHER LIMITATIONS. The cement-treated base shall not be mixed or <br /> � 39 placed while the atmospheric temperature is below 40°F (4°C) or when <br /> 40 conditions indicate that the temperature may fall below 35"F (2°C) within 24 <br /> 41 hours or when the weather is rainy. Cement-treated base shall not be placed on <br /> 42 frozen subgrade or mixed when aggregate is frozen. <br /> I 43 <br /> 44 PREPARING UNDERLYING COURSE. The dip subgrade should be ripped, <br /> 45 graded, or disc-loosened to a depth of at least 12 inches below grade. The <br /> { 46 loosened subgrade soils should be moisture conditioned such that the material is <br /> � 47 within 2 percenl of its optimum moisture content. <br /> 48 <br /> 1 Port of Everett FAWAT•03-039 <br /> Satellite RalllBarge Transfer Faclllty Final Port Review Drafl <br /> ( Phase 1:Pier Construction 45 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.