My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> � 1 Payment <br /> 2 Section 4-03.5: <br /> i3 Paymenl wil1 be made in accordance with Section 1-04.4 of the Standard <br /> 4 Specifications fo;the following bid item: <br /> 5 "Cement Treated Base"per square yard. <br /> i 6 <br /> � <br /> 1 <br /> , <br /> ► <br /> � <br /> � <br /> , <br /> � <br /> i <br /> 1 <br /> , <br /> � <br /> � <br /> I <br /> i <br /> � <br /> , <br /> I <br /> Port of Evereri FAWAT-03-039 <br /> Satellite RaIllBarge Transfer Faciltly Final Port Revlaw DraR <br /> J Phase 1:Pier Construction 47 15 March 2005 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.