Laserfiche WebLink
f <br /> � 1 Payment <br /> 2 Section 4-03.5: <br /> i3 Paymenl wil1 be made in accordance with Section 1-04.4 of the Standard <br /> 4 Specifications fo;the following bid item: <br /> 5 "Cement Treated Base"per square yard. <br /> i 6 <br /> � <br /> 1 <br /> , <br /> ► <br /> � <br /> � <br /> , <br /> � <br /> i <br /> 1 <br /> , <br /> � <br /> � <br /> I <br /> i <br /> � <br /> , <br /> I <br /> Port of Evereri FAWAT-03-039 <br /> Satellite RaIllBarge Transfer Faciltly Final Port Revlaw DraR <br /> J Phase 1:Pier Construction 47 15 March 2005 <br /> � <br />