Laserfiche WebLink
i <br /> J 1 DIVISION 5 <br /> 2 SURFACE TREATMENTS AND PAVEMENTS <br /> � 3 <br /> , 4 HOT MIX ASPHALT <br /> 5 Planing Bituminous Pavement <br /> � 6 Section 5-04.3(14) is supplemented with the following: <br /> 7 <br /> � 8 The Contraclor shall perform the planing operations no more than 10 calendar days <br /> 9 ahead of the time that ihe planed area is to be paved with HMA, unless otherwise <br /> 10 approved by the Engineer. <br /> 11 <br /> � 12 Payment <br /> 13 Section 5-04.5 is supplemenled with the following: <br /> 14 <br /> ( 15 All cosls for tack coat shall be included in the unit coniract price per square yard of <br /> , 16 the "Planing Bituminous PavemenP'. <br /> 17 <br /> � 18 HOT MIX ASPHALT <br /> 19 Section 5-04 is revised in ils entirety to read: <br /> 20 <br /> 1 21 5-04.1 Description <br /> 22 This work shall consist of providing and placing one or more layers of plant-mixed <br /> I 23 hot mix asphalt (HMA) on a prepared foundation or base in accordance with these <br /> 24 Specifications and the lines, grades, thicknesses, and typical cross-sections shown <br /> 25 in the Plans. <br /> � 26 <br /> 27 HMA shall be composed of asphalt binder and mineral materials as may be <br /> 28 reyuired, mixed in the proportions specified to provide a homogeneous, stable, and <br /> 29 workable mixture. <br /> 1 30 <br /> �. 31 HMA Class A, Class B, Class D, Class F, and Class G are designated as leveling or <br /> 32 wearing courses. HMA Class E is designated as a pavement base course. With the <br /> 1 33 exception of HMA Class D, all mixtures are considered dense graded HMA. <br /> � 34 <br /> 35 5-04.2 Materials <br /> J36 Materiais shall meet the requirements of the following sections: <br /> 37 <br /> 38 Asphall Binder 9-02.1(4) <br /> 39 Cationic Emulsified Asphalt 9-02.1(6) <br /> ! 40 Anti-Stripping Additive 9-02.4 <br /> 41 Aggregates 5-04.3(8)A2 <br /> 42 Blending Sand 9-03.8(4) <br /> J 43 Mineral Filler 9-03.8(5) <br /> 44 <br /> , 45 The contract documents may establish that the various mineral materials required <br /> 1 46 for the manufacture of HMA will be furnished in whole or in part by the Contracting <br /> 47 Agency. If the documents do not establish the furnishing of any of these mineral <br /> 48 materials by the Contracting Agency, the Contractor shall be required to furnish <br /> � Port of Evereri FAWAT•W-03A <br /> Satellite RaillBarge Transfer Facillty Final Port Review DraR <br /> � Phase 1:Pier Construction 48 15 March 20D5 <br />