My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> I 1 The paver shall be equipped with automatic screed controls with sensors for <br /> 2 either or both sides of the paver.The controls shall be capahie of sen�' ig grade <br /> � 3 from an outside reference line, sensing the transverse slc�e of the screed, and <br /> � 4 providing automatic signals that operate the screed to maintain the desired <br /> 5 grade and transverse slope. The sensor shall be constructed so it will operate <br /> , 6 from a reference line or a mat referencing device. <br /> ( � <br /> 8 The transverse slope controller shall be capable of maintaining the screed at <br /> � 9 the desired slope within plus or minus 0.1 percent. The paver shall be equipped <br /> 10 with automatic feeder controls, properly adjusted to maintain a unifortn depth of <br /> 11 materiai ahead of the screed. <br /> 12 <br /> � 13 Manual operation uf the screed wdl be permitted in the construction �f <br /> � 14 irregularly shaped and minor areas. These areas include, but are not limited to, <br /> 15 gore areas, road approaches, lapers and left-turn channelization. <br /> 1 16 <br /> � 17 When specified in the contract, reference lines for vertical control will be <br /> 18 required. Lines shali be placed on both outer edges of the (raveled way of <br /> � 19 eacli roadway. Horizontal contr ,I utilizing the reference line will be permitted. <br /> � 20 The grade and slope for intermediate lanes shall be controlled automatically <br /> 21 from reference lines or by means of a mat referencing device and a slope <br /> � 22 control device. When the finish of the grade prepared for paving is superior to <br /> 23 the established tolerances and when, in the opinion of the Engineer, further <br /> 24 improvement to the line, grade, cross-section, and smoothness can best be <br /> 25 achieved without the use oi the reference line, a mat referencing device may be <br /> i26 substituted for the reference line. Substitution of the device will be subject to <br /> 27 the continued approval oi the Engineer. A joint matcher may be used subject to <br /> 28 the approval o( the Engineer. The reference line rnay be removed after the <br /> I 29 comp!etion of the first course of HMA when approved by the Engineer. <br /> 30 Whenevar the Engine�r determines that any of these methods are failing to <br /> 31 provide the necessary vertical control, the reference lines will oe reinstalled hy <br /> 1 32 ihe Coniractor. <br /> 33 <br /> 34 The Contractor shall fumish and install all pins, brackets, tensioning devices, <br /> " 35 wire, and accessories necessary for satisfactory operation of the automalic <br /> � 36 control equipment. <br /> 37 <br /> � 38 If the paving machine in use is not providing the required finish, the Project <br /> 39 Engineer may susper�d work as allowed by Section �-08.6. Any cleaning or <br /> � 4U solvent type liquids spiiled on the pavement shall be thoroughly removed <br /> 41 before paving proceeds. <br /> � 42 <br /> 43 5-04.3(4) Rollers <br /> 44 Rcllers shall be of the steel wheei, vibratory, or pneurnatic tire type, in good <br /> f 45 condition and capable oi reversing without backlash. Operation of the roller <br /> 46 shall be in accordance witli the manufacturer's recommendations. When <br /> 47 ore'ered by the Project Engineer for any roiler planned fur use on the project, <br /> � 48 the Contractor shali provide a copy of the manufacturer's recommendation for <br /> 49 the use ef that roller for com�action of HMA. The number and weight of rollers <br /> 50 shall be su�cienl to compact the mixture in compiiance with the requirements <br /> � .51 oi Section 5-04.3(10). The use of equipment that results in crushing of the <br /> ' Port of Everett FAWAT-03-039 <br /> Satellite RaillBarpe Transfer Facility Flnal Port Review Draft <br /> � Phase�:Pler Construction 51 1!'March 2005 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.