My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> � <br /> I 1 the mixer unit. The thermometer location shall be convenient and <br /> 2 safe for access by inspectors. <br /> 3 <br /> I 4 The plant shall also be equipped with an approved dial-scale <br /> 5 thermometer, a mercury actuated thermometer, an electrc pyrometer, <br /> F or another approved thermometric instrument placed al the discharge <br /> � 7 chute of the drier to automatically register or indicate the temperature <br /> a of the heated aggregates. This device shall be in full view of the plant <br /> 9 operator. <br /> � 10 <br /> 11 3 Sampling and Testing of Mineral Materials. The HMA plant shall be <br /> 1Z equipped with a mechanical sampler for the sampling of the mineral <br /> i 13 materials. The mechanical sampler shall meei the requirements of <br /> 14 Section1-05.6 for crushing and screening operation. <br /> 15 <br /> � 16 The contractor shall provide su�cient space as required for the setup <br /> 17 and operation of the (ield testing facif�ties of the Contracting Agency. <br /> 18 <br /> i 19 5-04.3(2) Hauling Equipment <br /> 1 20 Trucks used for hauling HMA shall have tight, clean, smooth metal beds and <br /> 21 shall have a cover of canvas or other suitai�le material of su�cient size to <br /> � 22 protect ths mixture from adverse weather. 1�Jhenever the weather conditions <br /> 23 inciude (or are forecast to include) during the workshift precipitation or an air <br /> 24 temperature less than 45°F, the canvas cover shall be securely attached :� <br /> I 25 protect the HMA. <br /> 26 <br /> 27 In order to prevent the HMA mixture from adhering to the hauling equipment, <br /> 28 truck beds are to be sprayed with an environmentally benign release agent. <br /> I 29 Excess release agent shall be drained prior to filling hauling equipment with <br /> � 30 HMA. Petroleum derivatives or o,;ier coating materials that contaminate or <br /> 31 alter the characteristics of ihe HMA shall not be used. For hopper trucks, the <br /> f 32 conveyer shall be in operation during the process of applying the release agent. <br /> ' 33 <br /> 34 5-04.3(3) Hot Mix Asphalt Pavers <br /> � 35 HMA pavers shall be self-contained, power-propelled units, provided with an <br /> 36 internally-heated vibratory screed or strike-off assembly and shall be capabie of <br /> 37 spreading and finishing courses of HMA plant mix material in lane widths <br /> 1 38 required by the paving section shown in the Plans. <br /> 39 <br /> 40 The screed or strike-off assembly shall effectivefy produce a finished surface of <br /> � 41 the required evenness and texture without tearing, shoving, segregating, or <br /> 42 gouging the mixture. Extensions will be allowed provided they produce the <br /> 43 same results, including ride, density, and surface te:ture as obtained by the <br /> � 44 primary screed or strike off assembly. Extensions without, augers, vibration and <br /> J 45 heated screeds shall not be used in the traveied way. <br /> � 46 <br /> 47 When laying HMA, the paver shall be operated at a unifortn fonvard speed <br /> � 48 consistent with the plant production rate and roller train capacity to result in a <br /> 49 continuous operation. The auger speed and flight gate opening shall be <br /> 50 adjusted to coordinale with the operation. <br /> t 51 <br /> � Port ot Everett FAWAT-03-030 <br /> Satellite RalllBar9e Transfer Facllily Final Port Review Droft <br /> i Phase t:Pier Const�uctlen 50 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.