Laserfiche WebLink
i <br /> I � Degradation Factor, Other Courses 20 min <br /> 2 <br /> I 3 It shall be unilorm in quality, substantially free from wood, roots, bark, <br /> 4 extraneous materials, and adherent coatings. The presence of a thin, <br /> 5 firmly adhering film of weathered rock wili not be considered as <br /> I 6 coating unless it exists on more than 50% of the surface area of any <br /> 7 size between consecutive laboratory sieves. <br /> 8 <br /> I 9 Aggregate removed from deposits contaminated with various types of <br /> 10 wood waste shall be washed, processed, selected or otherwise <br /> 11 treated to remove sufficienl wood waste so that oven—dried material <br /> 12 retained on a U.S. No. 4 sieve shall not contain more than 0.1% by <br /> ( 13 weight of material with a specific gravity less than 1.0. <br /> 14 <br /> 15 B. Test Requirements. Aggregate (or HMA shall meet the �`ollowing test <br /> 16 requirements: <br /> � » Class of HA'.A <br /> �$ A B D E F G <br /> i 19 Fracture, by weight (See Note) � 2 3 4 4 2 <br /> 2� Sand Equivalent Min. 45 45 -- 45 35 45 <br /> 21 <br /> � zz �The iracture requirements are :�t least one fractured face on 90 <br /> 23 percent of the material retained �n each specification sieve size <br /> 24 U.S. No. 10 and above, if ihat sieve retains more than 5 percent <br /> I 25 of the total sample. <br /> 26 <br /> 27 2The fracture requirements are at least one fractured face on 75 <br /> � 28 percent oi the material retained on each specification sieve size <br /> 29 U.S. No. 10 and above, if that sieve retains more than 5 percent <br /> 30 of the total sample. <br /> � 31 <br /> � 32 3The fracture requiremenis are at least two fractured faces on 75 <br /> 33 percent and at least one iractured face on 90 percent of the <br /> � 34 material retained on each specification sieve, U.S. No. B and <br /> 35 above, if that sieve retains more than 5 percent of the total <br /> 36 sample. <br /> � 37 <br /> 38 4The fracture requirements are at least one fractured face on 50 <br /> 39 percent o( the material retained on each specification sieve size <br /> I 40 U.S. No. 10 and above, if that sieve relains more than 5 percent <br /> 41 oi the total sample. <br /> 42 <br /> 43 When material is being produced and slockpiled for use on a specific <br /> I 44 contract or for a future contract, the fracture and sand equivalent <br /> � 45 requirements shall apply at the time of stockpiling. When material is <br /> 46 used from a stockpile that has not been tested as provided above, the <br /> i 47 requirements for (racture and sand equivalents shall apply at the time <br /> 48 oi its introduction to the cold feed of the mixing plant. <br /> 49 <br /> I <br /> Port of EvereN FAWAT-03-039 <br /> Satellite RaillBarge Transfer Facility Final Port Review DreY. <br /> Phasc t: Picr Consimction 57 15 March 3005 <br />