Laserfiche WebLink
i <br /> � <br /> � <br /> � 1 The properties of the aggregate in a preliminary mix design for HMA <br /> 2 shall be such that, when it is combined within the limits set forth in <br /> I 3 Proportions of Materials and mixed in the laboratory with the <br /> 4 designated grade of asphalt binder, HMA mixtures with the following <br /> 5 test values can be produced: <br /> I 6 <br /> � Class of HMA <br /> 8 P, B D E F G <br /> I 9 Stabilometer Value Min. 37 35 ` 35 35 35 <br /> 10 Cohesiometer Value Min. 100 100 100 50 100 <br /> 11 Percent Air Voids 2-4.5 2-4.5 --- 2-4.5 2-4.5 2-4.5 <br /> 12 Modified Lottman <br /> J 13 Stripping Test Pass Pass Pass Pass Pass Pass <br /> � 14 <br /> 15 C. Gradation. The materials of which HMA is composed shall be of such <br /> I 16 sizes, gradings, and quantities that, when prcoortioned and mixed <br /> 17 together, they will produce a well graded mixture within the <br /> 18 requirements listed in the table which follows. <br /> � 19 <br /> 20 The percentages of aggregate refers to completed dry mix, and <br /> 21 includes mineral filler when used. <br /> I 22 <br /> 23 Grading Requirements <br /> 24 Class A Class D Class E Class F Class G <br /> I 25 Sieve Size and B Percent Passing _ � <br /> 26 1�/4 square 100 <br /> 27 1 square --- --- 90-100 --- --- <br /> I 28 3/4 square 100 �_ -- 100 -_� <br /> z9 5i8 square 67-86 <br /> 30 �/2 square 90-100 100 60-80 80-100 100 <br /> I 31 3i8 square 75-90 97-100 --- --- 97-100 <br /> 32 U.S. No. 4 46-66 30-50 34-56 38-70 50-78 <br /> 33 U.S. No. 8 -- 5-15 -- --- --- <br /> I 34 U.S. No. 10 30-42 _-_ 25-40 30-50 32-53 <br /> 35 U.S. No. 40 11-24 10-23 11-24 <br /> 36 U.S. No. 200 3.0-7.0 2.0-5.0 2.0-9.0 2.0-8.0 3.0-7.0 <br /> 37 <br /> � 38 5-04.(8)8 Basis ofAcceptance <br /> 39 <br /> I 40 1. HMA will be accepted based on its conformance to the project job mix <br /> 41 formula (JMF). For the determination of a project JMF, the Contractor shall <br /> 42 submit to the Engineer, representative samples of the various aggregates <br /> � 43 and blend sand to be used along with the gradation data showing the <br /> 44 various aggregate stockpile averages and the proposed combining ratios <br /> 45 and the average gradation of the compieted mix. Based on this submittat <br /> 46 from the Contractor, the Engineer will determine the asphalt binder <br /> I47 content, arti-strip requirement, and ignition furnace correction factor in the <br /> 48 mix design process. Using the representative samples submitted and <br /> 49 proposed proportion of each, trial mix tests will be run to determine the <br /> I <br /> POA of Everelt FAWAT-03-039 <br /> Satelllle RaillBarge Transfcr Facility Final Port Revfew Droft <br /> , Phase 7:Pier Construct�on 58 75 March 2005 <br />