My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> i 1 When more than one JMF is being utilized to produce HMA, lhe material <br /> 2 produced fur each JMF, shall be placed by separate spreading and compacting <br /> [ 3 equipment. <br /> ( 4 <br /> 5 5-04.3(10) Compaction <br /> 6 <br /> ' 7 5-04.3(10)A Genera/ <br /> 8 Immediateiy after the HMA mixture has been spread, slruck off, and surface <br /> I 9 irregularities adjusted, it shall be thoroughiy and unifortnly compacted. The <br /> 10 completed course shall be free from ridges, ruts, humps, dEpressions, <br /> 11 objectionable marks, or irregularities and in conforrnance with the line, grade, <br /> � 12 and cross-section shoNn in the Plans or as established by the Engineer. I( <br /> 13 necessary, the mix design may be altered to achieve desired results. <br /> ' 14 <br /> 15 Compaction shall take place when the HMA is in the proper condition so that no <br /> I 16 undue displacement, cracking, or shoving occurs. All compaction units shall be <br /> � 17 operated at the speed, within specification limits, that will produce ttia required <br /> 18 compaction. Freas inaccessibla to large compaclion equipment shall be <br /> � �9 compacted by mechanical or hand taroers. Any HMA that becomes loose, <br /> 20 broke�'�, contaminated, shnws an excess or defi�iency of asphal( binder, or is in <br /> 21 any way defective, shali be removed and replaced at no additional cust with <br /> � 22 fresh HMA which shall be immediately compacted to conform with the <br /> 23 surrounding area. <br /> 24 <br /> : 25 The type of rollers to be used and their relative posilion in the compaciion <br /> ' 26 sequence shali generally be the Contrac'or's option, provided specification <br /> 27 �ensities are attained.An exception shall be that the pneumatic tired roller shall <br /> 28 be used between October 1 and F pril 1. Coverage's with 2 vibratory or steel <br /> i29 wheel roller may precede pneumatic tired rolling. When HMA Class D is being <br /> 30 constr�cted, the use of pneumatic rollers will not be reyuired. <br /> 31 <br /> E 31 Vibratory rollers shall not be operated in the vibralory mode when the internal <br /> 33 temperalure of the HMA is less than 175°F without permission of the Engineer. <br /> 34 In no case shall a vibralcry roller be operaleo in a vibratory mode when <br /> ' 35 checking or cracking of ttie mat occurs at a oreater temperature. Vibratory <br /> � 36 rollers in the vibratory mode are also prohibited on bridge decks. <br /> 37 <br /> 1 38 5-04.3(10)B Contro! <br /> 39 �iMA Classes A, d, E, and F used in traffic lanes, including lanes for ramps, <br /> 40 truck climbing, weav�ng, and speed change, and having a specified compacted <br /> 41 course thickness greater than 0.10 foot, shall be compacted to a speci(ied level <br /> 42 i+f relative density. The specified level of relative density shall be a Composite <br /> 43 Pay Faclor (CPF) of not less than .75 when evaluated in accordance with <br /> 44 Section 1-06.2(1), using a minimum of 91.0 percent of the reference maximum <br /> 45 den�ity as dete�mined by WSDOT FOP for AASHTO T 209. The reference <br /> 4C m?ximum density shall be determined as the moving average of the most <br /> + 47 recent (ive determinalions for the lot of HMA being placed. The specified level <br /> 46 of density attained wiil be determined by the statistical evaluation of Tive nuclear <br /> � 49 densily gauge tesis tal:en in accordance with WAQTC FOP TM 8 and <br /> 50 WSDOT SOP T 729 on the day the HMA is placed (afler completion of the <br /> i <br /> Port ot Everett FAWAT-03-(139 <br /> Satel�ite Rai118arge Transfe�Facility Final Port Raview DraR <br /> �, Phase 7 Pier Constructlon 64 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.