My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br /> I 1 include an original sample location. A minimum of three random <br /> 2 samples of the suspect material will be obtained and tested. The <br /> � 3 material will then be evaluated for price adjustmer�t in accordance <br /> 4 with the statistical evaluation section. This material will be <br /> 5 considered a separate lot. <br /> i 6 <br /> 7 4. An Entire Sublot. If an entire sublot is rejected in accordance with <br /> 8 Section 1-06.2, four additional random samples from this sublot <br /> � 9 will be obtained and the sublot evaluated as an independent lot <br /> 10 with the original test result included as a fifth test with the new <br /> 11 independent lot inste�d of with the original I�t. <br /> 12 <br /> ` 13 5. A Lot in Progress. The Contractor shall shut down operations and <br /> � 14 shall not resume HMA placement until such time as the Project <br /> 15 Engineer is satisfied that specification material can be produced: <br /> � 16 <br /> 17 a. When the Composite Pay Factor (CPF) of a lot in <br /> 18 progress drops below 1.00 and the Contractor is taking <br /> � 19 no corrective action, or <br /> 20 b. When the Pay Factor (PF) for any constituent of a lot in <br /> 21 progress drops below 0.95 and the Contractor is taking <br /> � z2 no co!rective action, or <br /> 23 c. When either the PFi for any constituent or the CPF of a <br /> 24 lot in progress is less than 0.75. <br /> I 25 <br /> 26 6. An Entire Lot. An entire Ict with a CPF of less than 0.75 will be <br /> 27 rejected. The designated percentage reduction as defined in <br /> 28 Section 1-06.2(2)B under Financial Incentive Paragraph 1, Item 3, <br /> I Z9 shall be 25 percent. <br /> 30 <br /> 31 5-04.3(9) Spreading and Finishing <br /> I 32 The HMA shall be laid upon an approved surface, spread, and struck off to the <br /> 33 grade and elevation established. HMA pavers complying with Section 5-04.3(3) <br /> 34 shali be used to distribute the HMA mixture. Unless othervvise directed by the <br /> � 35 Engineer or specified in the Plans or in the Special Provisions, the nominal <br /> 36 compacted depth of any layer o` any course shall not exceed the following <br /> 37 depths: <br /> � 38 <br /> 39 HMA Class E 0.35 foot <br /> 40 HMA Class A and B 0.35 foot <br /> I 41 when used for k3ase Course <br /> 42 HMA Class A, B, and F 0.25 fool <br /> 43 HMA Class G 0.10 foot <br /> � 44 HMA Class D 0.08 fcot <br /> 45 <br /> 46 On areas where irregularities or unavoidable obstacles make the use of <br /> 47 mechanical spreading and finishing equipment impractical, the paving may be <br /> 48 done with other equipment or by hand. <br /> 49 <br /> Port ol Everett FAWAT-03-039 <br /> Satellite RaiVBarge Trensfer Facility Flnal Port Ravtew Dreft <br /> � Phase 1: Pier Constructfon 63 75 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.