Laserfiche WebLink
' <br /> , <br /> { 1 deiective in relative density. Such isolated malerial will not include an original <br /> 2 sample location. A minimum ot 5 randomly located density tests will be taken. <br /> � 3 The isolated area will then be evaluated for price adjustment in accordance <br /> 4 with the statistical evaluation section, considering it as a separate lot. <br /> 5 <br /> ` 6 5-04.3(11) Joinfs <br /> I 7 The Contractor shall conduct operations such that the placing of the top or <br /> 8 wearing course is a continuous operation or as close to continuous as possible. <br /> I 9 Unscheduled transverse joints will be allowed and the roller may pass over the <br /> 10 unprotected end of the freshly laid HMA only when the placement of the course <br /> 11 must be discontinued for such a length of time that the HMA will cool below <br /> 12 compaction temperature. When the work is resumed, the previously <br /> I 13 compacted HMA shall be cut back to produce a slightly beveled edge for the full <br /> 14 thickness of the course. <br /> 15 <br /> f 16 Where a scheduled transverse joint or when an unscheduled joint that must be <br /> I 17 left in place after a workshift is being made in the wearing course, strips of <br /> 18 heavy wrapping paper shall be used. The wrapping paper shall be removed <br /> l 19 and the joinl trimmed to a slightly beveled edge for the full thickness of the <br /> � 20 course prior fo resumption of paving. When the transverse joint will be open to <br /> 21 traHic a temporary wedge of HMA shall be constructed 50H:1 V or ilatter. <br /> � 22 <br /> 23 The material thal is cut away shall be wasted and new HMA shall be laid <br /> 24 against the fresh cut. Rollers or tamping irons shall be used to seal the joint. <br /> � 25 <br /> 26 The longitudinal joint in any one course shall be offset from the course <br /> 27 immediately be!ow by not rnore than 6 inches nor less than 2 inches. All <br /> 28 longitudinal joints constructed in the wearing course shall be located at a lane <br /> f29 line or an edge line of the traveled way. Except, on one-lane ramps a <br /> 30 longitudinal joint may be constructed at the center of the traffic lane, subject to <br /> 31 approval by the Projeci Engineer, if: <br /> � 32 <br /> ' 33 1. The ramp mu;:t remain open to tra`fi:., or <br /> 34 2. The ramp is cluseu t� iia�c a�;d a m;l-lapjoint is constructed. <br /> 35 <br /> 36 If a hol-lap joint is allowed, two paving machines sliall be used; a minimum <br /> 37 compacted density in accordance with Section 5-04.3(10)B shall be achieved <br /> 38 throughout the tra�c lane; and construction eq�ipment other than rollers shall <br /> 39 not operate on any uncompacted HMA. <br /> 40 <br /> � 41 When HMA is placed adjacent to cemenl concrete pavement, the Contractor <br /> 42 shall construct longitudinal joints between the HMA and the cement concrete <br /> 43 pavement. The joint shall be sawed to the dimensions shown on Standard Plan <br /> I 44 A-1 and filled with joint sealant meeting the requirements of Section 9-04.2. <br /> 45 <br /> 46 5-04.3(12) Vacant <br /> 47 <br /> i48 5-04.3(13) Surface Smoothness <br /> 49 The completed surface o( all courses shall be of uniform texture, smooth, <br /> 50 uniform as to crown and grade, and frse from defects of all kinds. The <br /> i <br /> Port of Everett FAWATA3�039 <br /> Satellite RaillBarge Transfer Facility Final Pon Rev�ew Drak <br /> �, Phase 1:Pier Construction 66 55 Maroh 2005 <br />