My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> ( 1 made for the weight of asphalt binder, blending sand, mineral filler, or any other <br /> 2 component of the HMA. <br /> 3 <br /> � 4 If the Contractor elects to remove and replace HMA as allowed by Section 5- <br /> 5 04.3(8)A, the material removed will not be measured. <br /> � 6 <br /> 7 Preparation of Untreated Roadway will be measured by the mile once along the <br /> 8 centerline cf the main line roadway. No additional measurement will be made for <br /> 9 ramps, auxiliary lanes, service roads, frontage roads, or shoulders. Measurement <br /> I 10 will be to the nearest 0.01 mile. <br /> t 11 <br /> 12 No specific unit of ineasure will apply to the force account item of Crack Sealing. <br /> � 13 <br /> � 14 Soil Residual Herbicide will be measured by the mile for the stated width to the <br /> 15 nearest .01 mile or by the squa�e yard, whichever is designated in the proposal. <br /> � 16 <br /> I 17 Pavement Repair Excavation Incl. Haul will be measured by the square yard o( <br /> 18 surface marked prior to excavation. <br /> 19 <br />� 20 Asphalt for Prime Coat will be measured by the ton in accordance with Section 1- <br /> 21 09.2. <br /> 22 <br /> 23 Prime Coat Aggregate will be measured by the cubic yard, truck measure, or by the <br /> 24 ton, whichever is designated in the proposal. <br /> 25 <br /> � 26 Asphalt For Fog Seal will be measured by the ton, before dilution, in accordance <br /> 27 with Section 1-09.2. <br /> 28 <br /> i 29 Longitudinal Joint Seals between the HMA �nd cement concrete pavement will be <br /> 30 measured by the linear foot along the iine and slope of the completed joint seal. <br /> 31 <br /> f 32 Pianing Bituminous Pavement will be measured by the square yard. <br /> � 33 <br /> 34 Temporary Pavement Marking will be measured by the linear foot as provi�ed in <br /> i 35 Section 8-23.4. <br /> 36 <br /> 37 Removing Temporary Pavement Marking wili be measured by the linear foot as <br /> � 38 provided in Section 8-23.4. <br /> � 39 <br /> 40 Water will be measured by the M gallon as provided in Section 2-07.4. <br /> � 41 <br /> 42 No specific unit of ineasure will apply to the calculated item of Anti-Stripping <br /> 43 Additive. <br /> 44 <br /> � 45 No specific unit of ineasure will apply to the calculated item of Job Mix Compliance <br /> 46 Price Adjustmenl. <br /> 47 <br /> � 48 No specific unit of ineasure will apply to the calculated item of Compaction Price <br /> 49 Adjustment. <br /> 50 <br /> � PortotEverett FAWAT-01039 <br /> Satellite RaillBarge Transfer Facility Final Port Review DraR <br /> IPhase 1:Pier Construc0on 70 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.