Laserfiche WebLink
( <br /> l 1 5-01.5 Payment <br /> 2 Payment will be made in accordance with Section 1-04.1, for each of the following <br /> i 3 bid items that are included in the proposal: <br /> 4 <br /> 5 "HMA CI._PG_", per ton. <br /> � 6 "HMA for Approach CI. PG ", per ton. <br /> 7 "HMA for Preleveling CI._ PG " per ton. <br /> 8 "HMA for Pavement Repair CI. _PG_", per ton. <br /> 9 "Commercial HMA", per ton. <br /> ! 10 The unit ccntract price per ton for "HMA CI. _ PG _", "HMA for Approach <br /> 11 CI. _ PG ", "HMA for Preleveling CI. _ PG ", "HMA for Pavement <br /> 12 Repair CI. _ PG _", and 'Commercial HMA" shall he full compensation for <br /> � 13 all costs incurred to carry out the requirements of Section 5-04 except for those <br /> 14 costs included in other items which are included in this sub-section and which <br /> 15 are included in the proposal. <br /> `, 16 <br /> � 17 "Preparation of Untreated Roadway", per mile. <br /> 18 The unit contract price per mile for "Preparation of Untrealed Roadway" shall <br /> � 19 be full pay for all work described under Section 5-04.3(5)B, with the exceptiori, <br /> � 20 however, that all costs involved in patching the roadway prior to placement of <br /> 21 HMA shall be inGuded in ihe unit contract price per ton for "HMA CI. PG <br /> I 22 " which was used for patching. I( the proposal does not include a bid item <br /> 23 for "Preparation of Untreated Roadway", the roadway shall be prepared as <br /> 24 specified, bul the wor{� shall be included in the �ontract prices of the other items <br /> � 25 of work. <br /> 26 <br /> 27 Ail costs for asphalt tack coat shall be included in the unit contract price per ton <br /> 28 of the H'tA. <br /> I 29 <br /> 30 "Crack Sealing", by(orce account. <br /> 31 "Crack Sealing"will be paid for by force account as specified in Section 1-09.6. <br /> , 32 For the purpose of providing a common proposai for all bidders, the Contracting <br /> 33 Agency has entered an amount in the proposal to become a part of the total bid <br /> 34 by the Contractor. <br /> + 35 <br /> � 36 "Soil Residual Herbicide ft. Wide," per mile, or <br /> 37 "Soil Residual Herbicide", per square yard. <br /> 38 The unit contract price per mile or per square yard for"Soil Residual Herbicide" <br /> i 39 shall be full payment for all costs incurred io obtain, provide and install <br /> 40 herbicide in accordance with Section 5-04.3(5)D. <br /> � 41 <br /> 42 "Pavement Repair Excavation Incl. Haul", �er square yard. <br /> 43 The unit contract price per square yard (or "Pavement Repair Excavation Incl. <br /> 44 Haul" shall be full paymeni ,'or all costs incurred to perforrn the work described <br /> i 45 in Section 5-04.3(5)E. <br /> � 46 <br /> 47 "Asphalt for Prime Coat", p2r ton. <br /> i 48 The unit contract price per ton for"Asphalt for Prime Coaf' shall be full payment <br /> 49 for all costs incurred to obtain, provide and install the material in accordance <br /> 50 with Sectian 5-04.3(5)B. <br /> � 51 <br /> � Port of Everett FAWAT-01038 <br /> Satelllte RaillBarge Trans(er Facility Final Port Review DraR <br /> � Phase 1:Pier Consttuction 71 15 March 20D5 <br />