Laserfiche WebLink
f <br /> � 1 contract price with no further statistical evaluation. When one or more <br /> 2 constituents fall outside the job mix formula, the lot shall be evaluated <br /> � 3 to determine the appropriate CPF. When less than three sublots exist, <br /> 4 backup samples oi the existing sublots or samples from the street <br /> 5 shall be tested to provide a minimum of three sets of results for <br /> � 6 evaluation. <br /> 7 <br /> 8 For each lot of HMA produced under Nonstatistical Evaluation when <br /> f 9 the calculeted CPF is less than 1.00, a Nonconfortning Mix Factor <br /> 10 (NCMF) will be detertnined. The NCMF equals the difference between <br /> 11 the CPF and unity with regard to sign multiplied by 60 percent. The <br /> 12 Job Mix Compliance Price Adjustment will be calculated as the <br /> I 13 product of the NCMF, the quantity of HMA in the lot in tons, and the <br /> � 14 unit contract price per ton of HMA. <br /> 15 <br /> I 16 3. Commercial Evaluation. If sampled and tested, HMA produced <br /> 17 under Commercial Evaluation and having all constituents falling within <br /> 18 the tolerance limits of the job mix fortnula shall be accepted at the unit <br /> � 19 contract price with no further evaluation. When one or rnore <br /> 20 constituents fall outside tolerances, the lot shall be evaluated to <br /> 21 determine the appropriate CPF. The tolerance limits will be used in <br /> � 22 the calculation of the CPF and the maximum CPF shall be 1.00. <br /> 23 When less than three sublots exist, backup samples of the existing <br /> 24 sublots or samples from the street shall be tested to provide a <br /> � 25 minimum of three sets of results for evaluation. <br /> 26 <br /> 27 5-04.5(1)8 Price Adjustments for Quality HMA Compaction <br /> 28 For each compaction control lot, a Compaction Incentive Price Adjustment <br /> ! 29 Factor (CIPAF) will be determined. The CIPAF equals the difference between <br /> � 30 the Composite Pay Factor and unity with regard to sign multiplied by 40 <br /> 31 percent. The Compaction Compliance Price Adjustment will be calculated as <br /> � 32 the product of CIPAF, the quantity of HMA in the compaction control lot in tons, <br /> 33 and the unit contract price per ton of HMA. <br /> 34 <br /> I <br /> ( <br /> � <br /> i <br /> � <br /> I <br /> Port of Everett FAWATA3-039 <br /> SMellite RaIIIBarge Transfer Facllity Final Port Raviaw Draft <br /> iPhase 7:Pler Construction T4 15 March 2005 <br />