My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
>
Address Records
>
1ST ST
>
1500
>
RAIL BARGE FACILITY
>
1500 1ST ST RAIL BARGE FACILITY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 2:25:52 PM
Creation date
3/7/2017 8:40:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST ST
Street Number
1500
Tenant Name
RAIL BARGE FACILITY
Notes
PROJECT MANUAL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I 1 5-04.5(1) Qua/ityAssurancePriceAdjustments <br /> 2 All HMA will be subject to price adjustments for Quality of HMA and Quality of <br /> � 3 HMA Compaction based on the Acceptance Plans in effect for each class of <br /> 4 HMA within the contract. For the purpose of providing a common proposal for <br /> 5 all bidders, the Contracting Agency has estimated a calculated amount for all <br /> 6 price adjustment items and has entered these amounts in the proposal to <br /> � 7 become a part of the total bid by the Contractor. <br /> 8 <br /> 9 5-04.5(1)A Price Adjustments ior Quality of HMA <br /> � 10 Statistical analysis of quality of gradation and asphalt binder content will be <br /> 11 detertnined based on Section 1-06.2 using the following price adjustment <br /> 12 factors: <br /> � 13 <br /> 14 Table of Price Adjustment Factors <br /> 15 Constituent Factor"P' <br /> i 16 All aggregate passing 1, 3/4 , <br /> � 17 5/8, �/2, and 3/8 sieves 2 <br /> � 18 All aggregate passing No. 4 sieve 6 <br /> 19 All aggregate passing No. 10 sieve 10 <br /> 20 Afl aggregate passing No. 40 sieve 6 <br /> 21 All aggregate passing No. 200 sieve 20 <br /> { 22 Asohalt cement 52 <br /> 1 23 <br /> 24 Factors for Open Graded Mix <br /> � 25 Constituent Factor"f' <br /> 26 All aggregate passing �/2 sieve 10 <br /> 27 All aggregate passing 3/8 sieve 15 <br /> 1 28 All aggregate passing No. 4 sieve 40 <br /> 29 All aggregate passing No. 8 sieve 15 <br /> 30 All aggregate passing No. 200 sieve 20 <br /> ( 31 <br /> � 32 Note: Open graded mix shall be evaluated for gradation only. The <br /> 33 quality incentive multiplier for open-graded mix shall be <br /> a 34 40 percent rather than 60. <br /> I 35 <br /> 36 If a constituent is not measured in accordance with these <br /> � 37 Specifications, its individual pay factor will be considered 1.00 in <br /> 38 calculating the Composite Pay Factor(CPF). <br /> ' 39 <br /> I 40 1. Statistical Evaluation. For each lot of HMA produced under Statislical <br /> 41 Evaluation, a Job Mix C�mpliance Incentive Factor (JMCIF) will be <br /> 42 determined. The JMCIF equals the algebraic difforence between the <br /> 43 CPF minus 1.00 multiplied by 60 Nercent. The Job Mix Compliance <br /> I 44 Price Adjustment will be calculated as ihe product of the JMCIF, the <br /> � q5 quantity of HMA in ihe lot in tons, and the unit contract price per ton of <br /> 46 HMA. <br /> 47 <br /> i 48 2. NonsWtistical Evaluation. Each lot of HMA produced under <br /> 4g Nonstatistical Evaluation and having all conslituents falling within the <br /> � 50 tolerance limits of the job mix formula shali be accepted at the unit <br /> � Port af Everett FAWAT-03-0J9 <br /> Satelllte RaIIIBarge'ranster Fac�lity Final Port Raview Dratt <br /> � Phase 1:Pier Construction 73 15 March 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.