Laserfiche WebLink
i <br /> I 1 5-04.5(1) Qua/ityAssurancePriceAdjustments <br /> 2 All HMA will be subject to price adjustments for Quality of HMA and Quality of <br /> � 3 HMA Compaction based on the Acceptance Plans in effect for each class of <br /> 4 HMA within the contract. For the purpose of providing a common proposal for <br /> 5 all bidders, the Contracting Agency has estimated a calculated amount for all <br /> 6 price adjustment items and has entered these amounts in the proposal to <br /> � 7 become a part of the total bid by the Contractor. <br /> 8 <br /> 9 5-04.5(1)A Price Adjustments ior Quality of HMA <br /> � 10 Statistical analysis of quality of gradation and asphalt binder content will be <br /> 11 detertnined based on Section 1-06.2 using the following price adjustment <br /> 12 factors: <br /> � 13 <br /> 14 Table of Price Adjustment Factors <br /> 15 Constituent Factor"P' <br /> i 16 All aggregate passing 1, 3/4 , <br /> � 17 5/8, �/2, and 3/8 sieves 2 <br /> � 18 All aggregate passing No. 4 sieve 6 <br /> 19 All aggregate passing No. 10 sieve 10 <br /> 20 Afl aggregate passing No. 40 sieve 6 <br /> 21 All aggregate passing No. 200 sieve 20 <br /> { 22 Asohalt cement 52 <br /> 1 23 <br /> 24 Factors for Open Graded Mix <br /> � 25 Constituent Factor"f' <br /> 26 All aggregate passing �/2 sieve 10 <br /> 27 All aggregate passing 3/8 sieve 15 <br /> 1 28 All aggregate passing No. 4 sieve 40 <br /> 29 All aggregate passing No. 8 sieve 15 <br /> 30 All aggregate passing No. 200 sieve 20 <br /> ( 31 <br /> � 32 Note: Open graded mix shall be evaluated for gradation only. The <br /> 33 quality incentive multiplier for open-graded mix shall be <br /> a 34 40 percent rather than 60. <br /> I 35 <br /> 36 If a constituent is not measured in accordance with these <br /> � 37 Specifications, its individual pay factor will be considered 1.00 in <br /> 38 calculating the Composite Pay Factor(CPF). <br /> ' 39 <br /> I 40 1. Statistical Evaluation. For each lot of HMA produced under Statislical <br /> 41 Evaluation, a Job Mix C�mpliance Incentive Factor (JMCIF) will be <br /> 42 determined. The JMCIF equals the algebraic difforence between the <br /> 43 CPF minus 1.00 multiplied by 60 Nercent. The Job Mix Compliance <br /> I 44 Price Adjustment will be calculated as ihe product of the JMCIF, the <br /> � q5 quantity of HMA in ihe lot in tons, and the unit contract price per ton of <br /> 46 HMA. <br /> 47 <br /> i 48 2. NonsWtistical Evaluation. Each lot of HMA produced under <br /> 4g Nonstatistical Evaluation and having all conslituents falling within the <br /> � 50 tolerance limits of the job mix formula shali be accepted at the unit <br /> � Port af Everett FAWAT-03-0J9 <br /> Satelllte RaIIIBarge'ranster Fac�lity Final Port Raview Dratt <br /> � Phase 1:Pier Construction 73 15 March 2005 <br />