Laserfiche WebLink
combination of conduit and trenchinq and/or riser conduit to <br /> accommodate the network communications cable within the confines <br /> of the complex. Provided thnt an acceptable combination of <br /> conduit and/or trenchinq are incorporated into the project to <br /> eccommodate the entrance cable, there will be no cost to the <br /> developer for GTE Northwest's cable. <br /> � If a r.earrengement of existing cables on premise or on the <br /> right-of-wey is necessary, appropriete charqes will be estimated <br /> and GTE�s Guarnnty of Payment form vill bs forwarded to the <br /> developer for siqnature. Prior to commencement of engineering <br /> for such reerrangement, a deposit will be required. To insure <br /> timely telephone service, GTE requests 90 deys leed tome for <br /> engineering, procurement, and installation of cable and/or the.'.r <br /> equipment. <br /> Should you require additionel information, contact Michael Hupf, <br /> Field Engineer at 756-4052. <br /> 6 <br />