My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10011 3RD AVE SE BASE FILE 2016-01-01 MF Import
>
Address Records
>
3RD AVE SE
>
10011
>
BASE FILE
>
10011 3RD AVE SE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 9:32:11 PM
Creation date
3/7/2017 9:31:32 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
10011
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 22 '90 �9�52 DRviD Ev4r15 fi u550�I4TE5 �ELLE�'�� P.b�S <br /> �Lmentation Sedimentation will be monitored annually at each ot two permanent <br /> santpling points. Accretion or loss of sediment will be measured relative to grade stakes <br /> installed at each sampling point. <br /> II. CONTINGENCY PLAN <br /> Should the desired mitigarion goal, as measured by the monitoring program and <br /> performance standazds, not be achieved, a joint determinavon by the City of Bverett and <br /> the project propouent will be made to implement the condngency plan. The conua�ency <br /> plan will Frovide for replaciag those plants that have not survived, for the manual remov;,� <br /> of aoxious weeds,e.g.reed canarygrazs nnd purple looses�ife,and for sedimeyt control. M <br /> assessment of the reason for the plant moctaliry will be madc by the monitoring biolo�st, <br /> and a rewmmendat;on made for alternatiee water sources or speaes composirion changes. <br /> Tt�e mntingenty plun can be enactcd fn whole or ia pan whenever tLe action is <br /> demonsVated by monitoring reporu to be wartanted. <br /> III. PERFORNG�NCE SECURYTY <br /> Performance Bond <br /> The proJea proponent will provide a performance security bond for wetland and landscape <br /> maintonance to ensurc that,maintenance and condngendes can be met during ihe Cvst three <br /> years aher canswction is complete. In order to detciminr. appropriate porfo:mance <br /> securiry, a cost ostimate for the instaUed landscaping for the mitigation plan has been <br /> obtained. T6e required bond amount Is 110%of this bid. A bond of S15,000 is required. <br /> The arrangement betwecn the projoct proponent and the G5ry implementation of <br /> cominganaes could include measures for releasing partial amounts of the security over time, <br /> � as t6e applicant demonsvatcs projcet periormance and mitigation sucass. <br /> I <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.