Laserfiche WebLink
Mar 22 '90 �9�52 DRviD Ev4r15 fi u550�I4TE5 �ELLE�'�� P.b�S <br /> �Lmentation Sedimentation will be monitored annually at each ot two permanent <br /> santpling points. Accretion or loss of sediment will be measured relative to grade stakes <br /> installed at each sampling point. <br /> II. CONTINGENCY PLAN <br /> Should the desired mitigarion goal, as measured by the monitoring program and <br /> performance standazds, not be achieved, a joint determinavon by the City of Bverett and <br /> the project propouent will be made to implement the condngency plan. The conua�ency <br /> plan will Frovide for replaciag those plants that have not survived, for the manual remov;,� <br /> of aoxious weeds,e.g.reed canarygrazs nnd purple looses�ife,and for sedimeyt control. M <br /> assessment of the reason for the plant moctaliry will be madc by the monitoring biolo�st, <br /> and a rewmmendat;on made for alternatiee water sources or speaes composirion changes. <br /> Tt�e mntingenty plun can be enactcd fn whole or ia pan whenever tLe action is <br /> demonsVated by monitoring reporu to be wartanted. <br /> III. PERFORNG�NCE SECURYTY <br /> Performance Bond <br /> The proJea proponent will provide a performance security bond for wetland and landscape <br /> maintonance to ensurc that,maintenance and condngendes can be met during ihe Cvst three <br /> years aher canswction is complete. In order to detciminr. appropriate porfo:mance <br /> securiry, a cost ostimate for the instaUed landscaping for the mitigation plan has been <br /> obtained. T6e required bond amount Is 110%of this bid. A bond of S15,000 is required. <br /> The arrangement betwecn the projoct proponent and the G5ry implementation of <br /> cominganaes could include measures for releasing partial amounts of the security over time, <br /> � as t6e applicant demonsvatcs projcet periormance and mitigation sucass. <br /> I <br /> � <br />