�J <br />PUBIIC WORKS <br />• <br />3. Design loads should be indicated on the drawings, per IBC section 1603.1, even for <br />,i conventional light frame construction. Design Ioads are nova indicated in the Project Data on <br />Cover Sheet AO <br />4. The design snow load should be accounted for on the roof framing design. Snow load is <br />„ accounled for, see accompanying slructural calcuiatinns per design snow load <br />5. Please indicate the detailing to conform to the 2009 International Building Code, induding all <br />new and existing materials, dimensioning, and connections. Thorough materials, dimensionmg <br />� and connections detailing has been provided <br />6. Calculation5 by a licensed Washington State Professional Engineer or Archited are required to <br />� verify that the new structure is designed to resist wind and gravity loading, per IBC chapter 16. <br />See accompanying structural calculations <br />Construction <br />1. New doors and �Nindows should be dimensioned in a door or window schedule with the <br />schedule symbol referenced on the plans. Schedules shouid indicate hardware sets for the new <br />/ doors, and type of glazing for the windows. Hardware schedule, door schedule, and door types <br />added to Proposed Plans sheet A2. <br />a. The minimum size for the accessible entrance door should be shown on the schedule as <br />2'-10" wide, 6'-8" high, per IBC section 1008.1.1. See door schedule <br />b. All new doors should be identified on the door schedule with a specifc door hardware <br />set that does no: require tight grasping, pinching or twisting of the wrist to operate, per <br />IBC section 100R.1.9.1. All doors are on door schedule, nole regarding 1008.1.9.1 <br />added <br />c. Door hardware height should be shown on schemat�c door elevations, per I(iC section <br />1008.1.9.2. Dimension locating door hardware on door types schematics <br />d. Vision lites (if any) should be shown on schematic door elevations per iBC A117.1 <br />secCion 404.2.10. No vision liles <br />� e. Ma[erials, such as safery alazing, should be shown on the door and window schedules, <br />as required by IBC section 2406.4. Window schedule calls for tempered glass in wmdow <br />tt2 <br />2. Ventilation can be handled either by natura� ventilation or mechanical ventilation, per IBC <br />,; 1203.1. It doesn't appear that all the windows are operable. Office and entry areas require an <br />airflow of 5dm per person and reception areas require 60 cfim per person, Fzr IMC table 4033. <br />At leasl one window is operable m each room, plans have been updated to show lhc existing <br />windows accuratety to address Utis item on Prcposed Flooi Plan 1,'A2 and Proposed Elevations <br />1lA3 <br />3. Comments that were not addressed on the drawings from the previous correciion letter have <br />been highiighted and attached to this letter. Please note tne following: <br />/ a. The hardware set for the accessible zntrance door should be shown on the drawings, <br />per the previous correction letter, comment 7. Hardware set is specified on new door <br />schedule and note on Proposed Floor PI2n 1/A2 <br />