Laserfiche WebLink
Mr. Donald Counsell, Architect <br />Plan Check No. B-45806 <br />October 24, 1994 <br />Page 3 of 3 <br />In order for the processing of your application to continue, it will be necessary to provide <br />the Building Division with two complete new sets of drawings retlecting the corrections <br />requested. <br />Upon resubmittal of the drawings, your application will be given priority and plan review <br />will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be const�ucted in compliance with all adopted <br />codes. <br />Sincerely, <br />� G � <br />Jeffrey S. McFall <br />Associate EngineerBuilding <br />15 M:j c 1([3-4 5 606. doc) <br />