Laserfiche WebLink
Waa+_e WaCer Trealment Plan Expansion <br />SMA 11-86 <br />Page -2- <br />Af�er due considecation of �_he evidence presen�.ed by the <br />Applicant; evidence elicited during Lhe public hearing; and as <br />�he cesul�_ of the personal inspection of the subject property <br />and surrounding areas by the EvereCt Hearing Examiner, Che <br />folloMing findings of fac�. and conclusions consli�_ute +_he basis <br />of lhe decisi�n of lhe Everett Hearing Examiner. <br />FINDI�1�'�$ Op �'A TyS <br />1. The Applicant has requesCed aopr�val of a Shoreline <br />Substantial Development Permi+_ for proper+.y 1c�cated on <br />Smilh Island, easr_ �f I-5, adjacenl �.o the exis�.ing <br />sewer Creatment faciliCy and more parlicularly described <br />in the atCachmen� to this document. (st.aff report) <br />2. The plant upgrzde proposed by the Applicant involves �.wo <br />stages of expansion. The first sCage of the project <br />includes: an improvemenC of Che oxidating pond <br />recirculalion by lhe installa�_ion of recirculaCion <br />channels along the west and east sides of the existing <br />oxidating pond; the dredging and utilization of thc <br />accumulated sludge in lhe aerated lagoons; the erec�.ion <br />of a scum-conlainment barrier in the aeraled lagoon; the <br />erec�.ion of a 9,500 square fool building t_o house lhe <br />sewec treai:men�, plants, laboratury, administration, and <br />maintenance activities; Che improvement of the <br />efficiency of the r_reatmenC plan�.'s effluent - <br />disinfection process; the enhancement of Che aeration in <br />�_he aerated lagoon by r_he ins�.allation of six additional <br />surface areas; lhe replacemenl of 25 mooring piles for <br />surface aerators; the reconstruction of wetland habitat. <br />aC Che southeast side of Che aerated lagoon; t,he <br />erection of fences and gates en either side of 4th <br />Street N.�.; the consCruction of a pipeline sysrem along <br />the center and nor+_hwesl dikes of aerated lagoon. These <br />listed improvemenCs are proposed as parl of sCage one <br />construction elements lhaC are lo commence in December, <br />1987, and be complet.ed by June, 1488. <br />S�age two of the proposed expansion involves the <br />construction of a 16,000,000 gallon par day mechanical <br />'_reatment planl which will utilir.e a �.rickling <br />filter/solid contact system of secondary treatment. A <br />temporary 8" to 10" pipeline will be ins�_alled to carcy <br />sludge from Che aerated lagoon Co Smith Island with a <br />surge barge to be l.ocaked on Sleamboa�_ Slough. (exhibi�_ <br />2) <br />