My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4027 4TH ST SE 2018-01-01 MF Import
>
Address Records
>
4TH ST SE
>
4027
>
4027 4TH ST SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:12:57 AM
Creation date
3/8/2017 12:05:06 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH ST SE
Street Number
4027
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wasle Water TreaCment Plan Expansion <br />SMA 11-86 <br />Poge -6- <br />compliance with Federal Regula�.ion Title 24, Section <br />1910.3; and, that all dikes be conslrucred to be two <br />feet above the regulatory flood protecCion elevation. <br />The Ci�y has indicated the above requirements should be <br />conditions ko the Shoreline Subst.antial Develapment <br />Permil. (staff report) <br />17. The City of Everett's waste water treatmenC faciliry i: <br />overloaded wilh iCs presenl configuraCion and must be <br />expanded to adequately provide services for future <br />population growlh projected within �.he area. With lhe <br />existing treatment facility, the CiLy will be unable tc <br />meet state waCer quality effluenC discharge standards. <br />With the inabili�.y to meet these standards, the City <br />will have discharge violations which could result in <br />fines or building mcra�.oriums imposed on the City of <br />Everet�. and the sewage service area. As a resulr., the <br />City is seeking expansion of the treatment facility. <br />(Ervine testimony) <br />18. As part of the City's long term sludge managemenr <br />progcam, a temporary 8" to lU" pipeline wilh a capacity <br />of 800 to 1,600 aallons per minute will be insCalled <br />during appcopriate seasons to CransporL lagoon sl.udge to <br />an agricultural utilizaLion site. The pipeline will <br />extend from the aerated la000n across Steamboat Slough <br />to Ebey zsland. Approximately 2,000 lineal feet of the <br />pipeline will be within the City limits. The City's <br />jurisdiction extends to the center line of the Sleamboat <br />Slough. However, the sludge will be disposed on Ebey <br />Island which is in Snohomish CounCy, which has <br />jurisdiction over the disposal site. (staff report) <br />19. The EvereCC Planning DepartmenC recommended approval of <br />Che Shoreline Subs�.anCial Development Permit as <br />requested subject to the following conditions: <br />1. That the project be developed according r_o the <br />site plan attached as Exhibit #9. <br />2. That all outside dike faces shall be h���roseeded <br />and that� all otner vegelation disturbed during <br />consCruction is replaced in kind, <br />Detailed landscaping plans shall be reviewed and <br />approved by the Planning Department prior to <br />issuance of any building permits showing planCing <br />details around all proposed buildings, Che <br />hydroseed mixture oroposed for the outside dike <br />face and the generai Creatmen�_ proposal for olher <br />areas dis:_urbed during conslruction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.