Laserfiche WebLink
Waste Water Trealment Plan Expansion <br />SMA 11-86 <br />Page -5- <br />11. With the expansion of �_he proposed sewage �.reatment <br />faciliCy, the CiCy of EveretC sysCem will be a regi��nal <br />treatment, facility ralher than a series of satellite <br />plants. This treatmenl plant will be consistent wikh <br />the lower Snohomish River Hasin Water Facili�_ies Plan <br />that is a plan designed Co implement the most cost <br />effective and environmenCally sound method of wasr_e <br />waCer treatment and disposal for the lower Snohomi�h <br />basin. (staff reperC) <br />12. U+_ili�.y services to the sile will be underground and <br />mus�: comply with the Snohomish County Shoreline Msster <br />Program Regulation N3 as sel: forth in Utilities page F66 <br />of lhe program. (staff report) <br />13. All pumping stations and similar treatment facilities <br />are required lo be aC least 200 feet from lhe ordinary <br />high water mark. Tiie Applicanr has submitted exhibiC 9 <br />showing the locations of lhe proposed buildings. All of <br />�_he pr:posed buildings comply wilh this requirement. <br />(sf.aff report, exhibiC 9) <br />14. Approximately 9,000 feet oE frontage on the Snohomish <br />R:ver is involved with the pro�osed application. In <br />addition, there is approximaCely 5,600 feet of fronlage <br />on Union Slough. The Shoreline Act requires tha�_ public <br />access b� provided by the Applicant for this fronCage. <br />FuCure public access adjacent to Union Slough and �.he <br />Snohomish River will be provided by the Applicant. <br />(sCaff report, ';:rvine lestimony) <br />15. �Phe Ci�y of Everett indicaCed that ihe City has a long <br />range goal for a network of shoreline access along Che <br />Snohomish River including Che area r_hat is the subjecl <br />of this permit. �?ith the achievem�nC of this goal, lhe <br />public will have �ccess r_o the shoreline and the City <br />will be able to provide, Co the maximum exCent feasible, <br />+_he right-of-ways along +_he shoreline for this access. <br />(Ervine testimony) <br />16. The zoning of the subject properl:y is Agricul�.ural Flood <br />Fringe. This zoning requires Chat the first floor of <br />all siructur.es be �.wo feet above the regulatory flood <br />protection elevation; that lhe fill be two feeC above <br />the regulaCory flood proteclion elevation for a distance <br />of 15 feet beyond all slructures in any direction; tha�_ <br />lhe beyond 15 feet from any slructure the fill is to be <br />no lower than one foot belo�� �.he regulatory flood <br />pcoteclion elevation; �_hat the development be in <br />