My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4027 4TH ST SE 2018-01-01 MF Import
>
Address Records
>
4TH ST SE
>
4027
>
4027 4TH ST SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:12:57 AM
Creation date
3/8/2017 12:05:06 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH ST SE
Street Number
4027
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Was+_e Water <br />SMA 11-86 <br />Page -8- <br />14. <br />15 <br />Treatment Plan Expansion <br />Minor devialions (lOB or less) from the proposed <br />plans shall be reviewed by Lhe Planning Direclor <br />to determine if additional public review is <br />necessary. Major deviation fcom the ins�.an�_ <br />application shall be submitled for review and <br />approval by Che Hearing Examiner. <br />16. Const.ructior. or substantial progress roward <br />conslruction of the project must be undertaker <br />within 2 years after final approval of the permi�_ <br />and completed wikhin 5 years. If the project has <br />not been completed in this time span, the permit <br />will be reviewed by the Planning Department which <br />will either exlend the permit for a period of one <br />year or terminate Che pecmit. <br />20. No �.estimony other than the City of Everetl's <br />representatives submir_�.ed testimony at the public <br />hearing. <br />Co�ICL�7Si�QNS <br />1. The app]icaCion is fo <br />Substan�.ial DevelopmenC <br />for property localed <br />adjacenC to the exisking <br />for the City of Everet <br />�_he expansion of the se <br />Che expansion of lhe <br />construc�.ion of a <br />activities telated <br />r the approval of a Shoreline <br />PermiC per CiCy Ordinance 723-80 <br />on Smi�.h Island, eas�, of I-5 <br />sewage treatment plant faciliCy <br />t. The specific requesC is Cor <br />wer Lreatment faciliCy including <br />aerated off-station p�nds, the <br />sewage treatment facility and other <br />to the sewage �_reatment facility of <br />the City of Everett. The exact proposed conslruction <br />activities ace set forCh in Finding #2 of this document. <br />2. A Shoreline Substantial Development Permit is required <br />per RCW 90.58.190(2). A Shoreline SubsCantial <br />Development Permit is required because: <br />(a) the project's proximity lo Snohomish River and the <br />Union Slough; <br />(b) the development is to occur on a shoreline as <br />defined in RCW 90.58.030; and <br />(c) +_he development is a substantial developmen�, as <br />defined in RCW 90.58.030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.