Laserfiche WebLink
� <br />The first floor of all structures <br />minimum two feet of freeboard above <br />Lhis fill must extend fifteen feet <br />directions. The applicant mu3t <br />Elevation Certificate/Floodproofing <br />document to the Planning Department. <br />must be elevated so there is a <br />the 100-year flood elevation and <br />beyond both structures in all <br />complete a Post Construction <br />Certificate and submit that <br />2. The applicant must prepare a landscaping plan for both structures <br />showing location, type, and size of plantings at the time of <br />inatallation, for review and approval by the Planning Department <br />prior to issuance of building permits for these facilities. <br />3• That construction or substantial pr�ogress toward construction of this <br />project must be undereaken within two years after final approval of <br />the permit and completed within five years. If the project has not <br />been completed in this time span, the permit will be reviewed by the <br />Planr.ing Department who will either extend the permit for one year or <br />term±nate the permit. <br />/ <br />i �`� <br />ennis L. Derickson, AZCP <br />Planning Director <br />3676F <br />