My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5104 S 2ND AVE 2018-01-01 MF Import
>
Address Records
>
S 2ND AVE
>
5104
>
5104 S 2ND AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 3:27:01 PM
Creation date
3/8/2017 12:18:19 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5104
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check NB-44775/B-44776 <br />August 22, 1994 <br />Page 4 <br />✓ 29. A I-H?t fire-resistive occupancy separation is required between storage or <br />laundry rooms that are used in common by tenants and the rest of the building. <br />Sec�cr 1202(b). <br />VsO. A I-HR fire-resistive occupancy separation is rcquired between a boiler room, <br />central heating plants, or hot water supply boiler and Group R, Division I <br />Occupancies when serving more than one dwelling unit. Section 1212. <br />In order for the processing of your application to continue, it will be necessary to <br />provide the Building Division with two complete new sets of drawings reflecting the <br />cnrrections requested. <br />Upon submittal of the drawings, your application will be given priority and plan review <br />will recommence. <br />Sincerely <br />, l� �' <br />eff e . McF ll <br />Associate Engineer/Building <br />jd/JMpcb-44775-B-44776 <br />t' <br />
The URL can be used to link to this page
Your browser does not support the video tag.