Laserfiche WebLink
Yr16NiLulL1A-lTlLawSk.C::{Y.a�.vf4�'.::..:t'�!s:'•v . . :;:f.�n.ky.�.ww .... ._.ao!..n•�n�a.i\:'.r)etl-�•r:wM�;�M.�✓N,'UFr-..r�wG•7•l+�V�'.C/M!�TK!wY:�f�t�C'M1+�►%Av.• <br />• <br />1 - � <br />• �`I � <br />REPAIR SPECIFICATIONS AND LIST OP WORR TO SE BID <br />Address : �' � � . c�/ � <br />°a4e � fJr `f- <br />1. Roofi[1 Tear off existing chimney to beloW roof <br />ne. Tear off existing roofing complete to skip <br />sheathing. Provide all necessary protections to persons <br />and property while roof is exposed. Tear off all <br />existing soffit materials at all eaves and replace with <br />new soffit to match style and thickness of existiag <br />soffit. Material for soffit nay be tight knot. <br />Replace ro�ted rafter tails, (assume fifty rotted rafter <br />tails including all hip tails) , using 2 x 6 tight knot <br />stock, milled on bandsaw to match profile of existing <br />tails. New tails : run through blocking to scab into 2 <br />x 4 roof rafters as per existing. Replace blocking as <br />necessary to achieve this standard. Replace all <br />existing roof rafters on front pocch hip roof. Replace <br />skip sheathing over front porch hip roef. <br />install cedar shake shingle roof complete. Shakes <br />24", medium or better, approved fer 10" exposure by the <br />manufacturer �:ith double start�r course and 30b <br />asphaltic felt interlayment. Valley flashing : 30A felt <br />under 14" crimp metal flashing. install zinc moss <br />prevention strips to all ridges on each side. <br />Tear off existing roofing on shed (north�vest of house). <br />Install 3/8" CDX plywood sheathing and selvage edge roll <br />roofinq, owner choice of color, in accordance with <br />manufacturer's installation instructions. <br />s �/� <br />2. Gutters Tear off existing house gutters complete. <br />install new continuous aluminum gutters on all house <br />eaves, with back leg of gutter cut back to fit guttecs <br />onto notched rafter tails. Install secured with metal <br />straps under roofing 48" O.C. Install matching <br />•downspouts as necessary to drain gutters. Secure <br />downspov,ts at Eop, bottom and all joints. Provide <br />splashblocks at each doanspout. <br />� 8�D <br />3. Foundation Tear <br />complete. Replace any <br />of infestation or rot. <br />as necessary to <br />house (not porch <br />foundation beams <br />beams. <br />code. <br />beam) <br />to a <br />off existing house skirtinq <br />foundation posts which show signs <br />Izstall new concrete pier blocks <br />Replace beam on north side of <br />and any other rotted sections of <br />total of 50 linear feet of new <br />� ����d � '7 <br />1� 07 1986 <br />APR <br />� . ................ <br />...... ... . <br />......... _ <br />�� EVERE'R <br />C p '�ic YVorks DePt. <br />