My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5204 S 2ND AVE 2016-01-01 MF Import
>
Address Records
>
S 2ND AVE
>
5204
>
5204 S 2ND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 6:04:58 PM
Creation date
3/8/2017 12:20:56 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5204
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />REPAIR SPECIFICATIONS AND LIST OP WORlC TO BE BID <br />� Paq� ✓ pi � <br />Address: �%a� S ��� <br />Tear off all rotted backing for skirti;:g on the house. <br />I:nstall new pressure treated bottom c1�o�d a�d install <br />new backing member.s Eor the fotlewing skirting <br />installation: Insta7.1 3/16" concre�e z�sbestos beard <br />£rom yrade to a minim�.m of 6" above gzade. Install 1/2" <br />CDX plywood from c.a.b. to wa•.ectable trim boards. <br />Install wood shinqles to 1ap c.a..b. a minimum of 1/2", <br />stepped as necessazy, to watertable trim. Shingles :#2 <br />cedar sawn shingles with double starter course, 18" <br />shingles with maximum 8-1/2" exposure. Install 1 x 3 <br />outside corner boards and 2 x 2 inside corner board <br />cedar. Butt shingles to corner boards. I:�sta1L <br />screened foundation vents, 6" x 12", trimmed with 1 x 2 <br />cedar, four vents in all, located near corners. <br />� �S CL'� <br />Paintinq power wash house siding and scrape all <br />loose and peeling paint from siding and trim. Power <br />wash shed northwest of house. Prime all new and bare <br />wood on house and skirtinq (shingles only) with oil <br />based primer. Paint entire house two coats, two colors, <br />ownec choice of colors, oil based oaint. Paint shed, <br />one color, two coats. Do not pai.nt or remove storm <br />windows. <br />$ �CCCS <br />Front Porch Tear up entire deck on front porch. <br />Replace deck with new tongue and yroove decking <br />material, same thickness as existing. Tear off existing <br />wood steps from front porch including stri�igers and <br />bther structural members. <br />See drawing for design of new steps and rail from front <br />porch. Paint ra.il as per Itei„ 4. Paint deck two coats <br />oil base deck paint, owner choice of color, include <br />abrasive admisr.ure. <br />e /�.-CJ <br />6. �P_l_umb�in Properly hook-up tub drain overflow and <br />replace existing hardware with new, Delta or equal, as <br />necessary. <br />Install new 1-1/2" diameter drain and vent for clothes <br />washec through wall between kitchen and back porch, <br />vented through rcof, tied into main waste drain. <br />$ �� <br />Electrical Install new thermostat to repl �.• <br />exist g—in kitchen. Repair two baseboard electric <br />heaters in dining room. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.