Laserfiche WebLink
4) Will the proposal require surface water <br />withdrawals or diversions? Give general <br />description, purpose, and approximate quan- <br />tities, if known. <br />This proposal will not require any with- <br />drawal or diversion of surface water. <br />5) Does the proposal lie within a 100-year <br />floodplain? If so, note location on the site <br />plan. <br />Burlington Northern Railroad right-of-way and <br />the Lowell River Road portions of the proposed <br />cable route lie within the 100-year floodplain <br />area. <br />6) Does the proposal involve any discharges <br />of waste materials to surface waters? If so, <br />describe the type of waste and anticipated <br />volume of discharge. <br />The proposal does not involve any discharge of <br />waste materials to surface waters. <br />b. Ground: <br />1) Will ground water be withdrawn, or will <br />water be discharged to ground water? Give <br />general description, purpose, and approximate <br />quantities, if known. <br />There will be no withdrawal of or discharge to <br />ground water. <br />2) Describe waste materials that will be <br />discharged into the ground from septic tanks <br />or other sources, if any (for example: <br />domestic sewage; industrial; agricultural; <br />etc.) Describe the general size of the <br />system, the number of such systems, the <br />number of houses to be served (if applic- <br />able), or the number of animals or humans the <br />system(s) are expected to serve. <br />Not applicable. <br />-7- <br />Evaluation for <br />Agency Use Only <br />