Laserfiche WebLink
C. Water Runoff (including storm water): <br />1) Describe the source of runoff (including <br />storm water) and method of collection and <br />disposal, if any (include quantities, if <br />known). Where will this water flow? Will <br />this water flow into other waters? If so, <br />describe. <br />current sources of runoff include unknown <br />quantities of rainfall and runoff from adja- <br />cent roadbeds. No permanent alteration of <br />existing collection or disposal methods will <br />occur; no additional collection or disposal <br />facilities will be required as a result of <br />this project. <br />2) Could waste materials enter ground or <br />surface waters? If so, generally describe. <br />Waste materials will not enter surface or <br />ground waters during normal construction and <br />operations. <br />d. Proposed measures to reduce or control surface, <br />ground, and runoff water impacts, if any: <br />No significant impacts are anticipated, there- <br />fore mitigation measures have not been pro- <br />posed. <br />4. Plants <br />a. Check or circle types of vegetation found on <br />the site: <br />_ deciduous tree: alder, maple, aspen, <br />other <br />evergreen tree: fir, cedar, pine, other <br />_ shrubs <br />_ grass <br />pasture <br />crop or grain <br />wet soil plants: cattail, buttercup, <br />skunk cabbage, other <br />_ water plants: water lily, eelgrass, mil - <br />foil, other <br />other types of vegetation: blackberry <br />See Table 4. <br />-8- <br />Evaluation for <br />Agency Use Only <br />