My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5309 S 2ND AVE 2018-01-02 MF Import
>
Address Records
>
S 2ND AVE
>
5309
>
5309 S 2ND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 2:52:13 PM
Creation date
3/8/2017 12:26:19 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5309
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT TO HEARING EXAMINER <br />SPECIAL PROPERTY USE PERMIT t16-87 <br />US SPRINT FIBER OPTICS FACILITY <br />Date Prepared: January 14, 1988 <br />Applicant: Doug Muzzy <br />US Sprint Communications Company <br />9300 Metcalf, Suite 846 <br />Overland Park, KS 66212 <br />Project Coordinator/ Mary Cunningham <br />Planning Department: Phone: 259-8731 <br />Requested Action: Special Property Use Permit <br />Location of Proposal: east of 2nd St., 60 feet south of Main St, in Lowell <br />Project Description: The construction of a fiber optic telecommunication <br />facility consisting of two 384 sf buildings, a 100 <br />s£ generator building and two unaerground vaults. <br />Zoning: B-2 <br />Comprehensive Plan: Neighborhood Business <br />Surrounding Zoning/ north: 9-2/commercial, single family <br />Land Use: south: B-2/single family <br />east: M-1/vacant, Burlington Northern Railroad <br />west: B-2/single family, commercial <br />Project Size: 7,200 sf lot <br />Exhibits: <br />1. Staff Report <br />2. Vicinity/Zoning Map <br />3. Assessor's Map <br />4. Determination of Non -Significance <br />5. Agency Comments <br />6. Narrative Statement <br />7. Site Plan <br />8. Building Elevation <br />9. Photo of Standard Building <br />Findings and Conclusions: <br />The following findings and conclusions are based on the criteria establisned <br />in Section 19.58.020 (B), 1-3 of the Everett Municipal Code: <br />Compatibility. The proposed use must be reasonably compatible with <br />other uses and potential uses within the general area in which the use <br />is to be located. <br />Finding: The applicant proposes to build an approximately 384 sf <br />building to house fiber optic telecommunication facilities. In the <br />future (within five years) the applicant proposes to build a second 384 <br />sf building and a 25 kw generator building for backup power. Two small <br />(about 2 feet by 2 feet underground vaults would also be installed. :'he <br />applicant proposes that two on -site parking spaces be provided -1, <br />employees would be stationed on the site. One technician would visit <br />the site occasionally. It is expected that vehicle trips would aver3o? <br />about .25 trips per day. Security lighting would be provided 24 hDurz <br />per day. <br />The proposed buildings would to located in a B-2, Community Business <br />zone. Surrounding uses include single family homes and businesses. <br />The site is fairly flat and has a view of the Snohomish River to the <br />east. The proposed building is an approximately 10 feet high precast <br />concrete building with a flat roof and exterior air conditioning units. <br />A photograph of the standard building and elevations of the propose: <br />building are provided in Exhibits y and 9. Both the Parks 2epartment <br />
The URL can be used to link to this page
Your browser does not support the video tag.